Donegal County Council · 2660496

CROCKAHENNY , INISHOWEN , CO. DONEGAL

  1. 24 Mar 2026Received
  2. 28 Apr 2026Observations closed
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Withdrawn or invalid
Decision
Not yet
Council
Donegal County Council
Type
PERMISSION
Site
6,228 m²

What’s proposed

A 10 YEAR PLANNING PERMISSION FOR A LONG DURATION ENERGY STORAGE FACILITY CONSISTING OF: INSTALLATION AND OPERATION OF 1 NO. BATTERY ENERGY STORAGE SYSTEM COMPOUND CONTAINING BATTERY ENERGY STORAGE CONTAINERS, 1 NO. ELECTRICAL SUBSTATION AND COMPOUND, CONNECTION TO THE NATIONAL GRID SYSTEM VIA 50M OF UNDERGROUND CABLE TO THE ESB CROCKAHENNY 38KV SUBSTATION, ELECTRICAL TRANSFORMERS AND INVERTER UNITS, UNDERGROUND CABLING AND DUCTING, BOUNDARY FENCING, SECURITY ENTRANCE GATES, CCTV, INTERNAL ACCESS ROAD, ASSOCIATED ANCILLARY SITE DEVELOPMENT, LANDSCAPING AND REINSTATEMENT WORKS. THE OPERATIONAL LIFESPAN OF THE DEVELOPMENT WILL BE 35 YEARS AND THE SITE OF THE PROPOSED DEVELOPMENT HAS A TOTAL AREA OF C. 0.54 HECTARES. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

2660496 is a planning application to Donegal County Council for a 10 YEAR PLANNING PERMISSION FOR A LONG DURATION ENERGY STORAGE FACILITY CONSISTING OF, received on 24 Mar 2026; the file is recorded as incompleted application.

Planning details

Reference
2660496
Local authority
Donegal County Council
Status
Withdrawn or invalid · register status “INCOMPLETED APPLICATION
Received
24 Mar 2026
Observations close
28 Apr 2026 (closed 144 days ago)
Decision due
No due date published
Decision
Not decided
Proposed development
A 10 YEAR PLANNING PERMISSION FOR A LONG DURATION ENERGY STORAGE FACILITY CONSISTING OF: INSTALLATION AND OPERATION OF 1 NO. BATTERY ENERGY STORAGE SYSTEM COMPOUND CONTAINING BATTERY ENERGY STORAGE CONTAINERS, 1 NO. ELECTRICAL SUBSTATION AND COMPOUND, CONNECTION TO THE NATIONAL GRID SYSTEM VIA 50M OF UNDERGROUND CABLE TO THE ESB CROCKAHENNY 38KV SUBSTATION, ELECTRICAL TRANSFORMERS AND INVERTER UNITS, UNDERGROUND CABLING AND DUCTING, BOUNDARY FENCING, SECURITY ENTRANCE GATES, CCTV, INTERNAL ACCESS ROAD, ASSOCIATED ANCILLARY SITE DEVELOPMENT, LANDSCAPING AND REINSTATEMENT WORKS. THE OPERATIONAL LIFESPAN OF THE DEVELOPMENT WILL BE 35 YEARS AND THE SITE OF THE PROPOSED DEVELOPMENT HAS A TOTAL AREA OF C. 0.54 HECTARES. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)
As published by the register.
Site area
6,228 m² from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby 7 applications within 500 m in the last 5 years

Explore this area on the map →

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    No other designation nearby.

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 345006). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/DonegalCC/AppFileRefDetails/2660496/0.

    Source: npad · fetched 18 Sept 2026, 15:44
    SourceLicenceFetchedLink
    npadCC-BY-4.018 Sept 2026, 15:44open