Crilly, Tullylinn, Pettigoe Donegal PO
Approved in Oct 2026.
- 8 Sept 2026Received
- 30 Oct 2026Conditional
- 30 Oct 2031Approval runs out
Planning details
- Status
- Approved
- Decision
- Conditional · 30 Oct 2026
- Reference
- 2661665
- Received
- 8 Sept 2026
- Site
- 24.46 ha
What’s proposed
VARIATION OF CONDITION NO. 4 OF PERMISSION GRANTED FOR CRILLY WIND FARM (PLANNING REF. NO. 13/51404 AND AN COIMISIÚN PLEANÁLA REF. ABP PL 05E.245588 REFERS) WHICH RELATES TO THE DURATION OF THE CONSTRUCTION WORKS TO FACILITATE THE PERMITTED DEVELOPMENT.
Show all
IT IS PROPOSED TO VARY CONDITION NO. 4 TO EXTEND THE DURATION OF THE CONSTRUCTION WORKS BY 5 YEARS TO FACILITATE THE CONSTRUCTION OF THE PREVIOUSLY PERMITTED DEVELOPMENT COMPRISING 4 NO. WIND TURBINES WITH A MAXIMUM BLADE DIAMETER OF 93M AND A MAXIMUM BLADE TIP HEIGHT OF 126.5M, ALL ANCILLARY DEVELOPMENTS AND ASSOCIATED SITE DEVELOPMENT WORKS. THE PERMITTED DEVELOPMENT INCLUDES ACCESS OFF SEEGRONAN ROAD, KILLETER, CASTLEDERG, CO. TYRONE AND NO ALTERATION IS PROPOSED TO THE NATURE, SCALE OR DESIGN OF THE PERMITTED DEVELOPMENT. THIS DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)
Every application, appeal and deadline within 500 m
Get the full reportNearby none · 500 m · 5 years
No other application within 500 m in the last 5 years.
Not held yet for Donegal County Council: zoning.
Where this comes from
National planning feed (NPAD), fetched 11 Nov 2026, 23:00.
Source: National Planning Application Database · fetched 11 Nov 2026, 23:00
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 11 Nov 2026, 23:00 | open |
Summary
2661665 is a planning application to Donegal County Council for variation of condition no. 4 of permission granted for crilly wind farm (planning ref., received on 8 Sept 2026; permission was granted with conditions on 30 Oct 2026.