Galway City Council · 251

Dock Road, Queen Street &Bothar na Long, Galway

Refused in 2025.

  1. 8 Jan 2025Received
  2. 11 Jul 2025Refused

Earlier approval here ran out with no sign of building: 20367 (2021)

Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Refused
Decision
Refused · 11 Jul 2025
Council
Galway City Council
Type
EXTENSION OF DURATION
Site
9,352 m²

Live near Dock Road?

Everything else planned on your street, in one report.

Check my street
Council register ↗

What’s proposed

Permission for development which consists of; the proposal consists of mixed use office development (c. 34,765sqm) provided in 4 no. blocks over a single basement level. Block A is an eight storey building, located in the north west part of the site adjoining Dock Road/Queen Street containing retail/restaurant/café use and electricity supply board substitution at ground level, office use at ground level to level 07, plant at level 07, external terraces at levels 04 to 06 with a roof garden at level 07, solar panels on the roof. Block B is a seven storey building with roof plan above, located in the south west corner of the site adjoining Dock Road and Bothar Na Long, containing the basement access ramp, retail/restaurant/café use at ground level and mezzanine level, office use at ground level to level 06, external terraces at Levels 01 to 06 with external links with Block C, roof garden at level 07, solar panels on the roof. A bridge link is proved at level 04 between blocks a+b. Block C eight storey building with roof plant above, located in the southern part of the site adjoining Bothar na Long containing retail/restaurant/café use at ground floor level, office use at ground floor level to level 07, roof garden at level 08, solar panels on the roof. Block D is an eight storey building with roof plant above, located along the eastern boundary of the site adjoining Bothar na Long to the south, containing office use at ground level to level 07, external terraces at levels 01 to 07 with external links to block c, roof garden at level 08, solar panels on the roof. In addition to the four office blocks, the single basement level (7,030 Sq m.) contains 138 no. car spaces, 162 no. cycle spaces, a commuter centre, office lobby areas, building facilities and plant. External amenity space is provided at ground level comprising a raised central plaza, basement ventilation areas, 52 no. surface cycle spaces and public realm improvements to the north and west of the site. Vehicle access is from Dock Road; fire tender access is from Dock Road/Queen Street and the proposed public realm to the north; and pedestrian access is from Dock Road, Bothar na Long and the proposed public realm to the north

Planning details

Reference
251
Local authority
Galway City Council
Status
Refused · register status “APPLICATION FINALISED”
Received
8 Jan 2025
Observations close
12 Feb 2025 (closed 602 days ago)
Decision due
13 Jul 2025 · decided 11 Jul 2025
Decision
Refused on 11 Jul 2025
Proposed development
Permission for development which consists of; the proposal consists of mixed use office development (c. 34,765sqm) provided in 4 no. blocks over a single basement level. Block A is an eight storey building, located in the north west part of the site adjoining Dock Road/Queen Street containing retail/restaurant/café use and electricity supply board substitution at ground level, office use at ground level to level 07, plant at level 07, external terraces at levels 04 to 06 with a roof garden at level 07, solar panels on the roof. Block B is a seven storey building with roof plan above, located in the south west corner of the site adjoining Dock Road and Bothar Na Long, containing the basement access ramp, retail/restaurant/café use at ground level and mezzanine level, office use at ground level to level 06, external terraces at Levels 01 to 06 with external links with Block C, roof garden at level 07, solar panels on the roof. A bridge link is proved at level 04 between blocks a+b. Block C eight storey building with roof plant above, located in the southern part of the site adjoining Bothar na Long containing retail/restaurant/café use at ground floor level, office use at ground floor level to level 07, roof garden at level 08, solar panels on the roof. Block D is an eight storey building with roof plant above, located along the eastern boundary of the site adjoining Bothar na Long to the south, containing office use at ground level to level 07, external terraces at levels 01 to 07 with external links to block c, roof garden at level 08, solar panels on the roof. In addition to the four office blocks, the single basement level (7,030 Sq m.) contains 138 no. car spaces, 162 no. cycle spaces, a commuter centre, office lobby areas, building facilities and plant. External amenity space is provided at ground level comprising a raised central plaza, basement ventilation areas, 52 no. surface cycle spaces and public realm improvements to the north and west of the site. Vehicle access is from Dock Road; fire tender access is from Dock Road/Queen Street and the proposed public realm to the north; and pedestrian access is from Dock Road, Bothar na Long and the proposed public realm to the north
As published by the register.
Site area
9,352 m² from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby 137 · 500 m · 5 years

Show all 137

Explore this area on the map →

Homes nearby

Zoning

M2 — Major town centre

The main town centre — retail, offices, civic uses, apartments.

Protections nearby 250 m

No mapped flood area nearby.

  • NIAH-recorded building · 35
    O'Connell's; house
  • Recorded monument · 10
    Graveyard; Bastioned fort

Where this comes from

National planning feed (NPAD), fetched 22 Sept 2026, 16:10.

Source: npad · fetched 22 Sept 2026, 16:10
SourceLicenceFetchedLink
npadCC-BY-4.022 Sept 2026, 16:10open
Summary

251 is a planning application to Galway City Council for permission for development which consists of; the proposal consists of mixed use office, received on 8 Jan 2025; permission was refused on 11 Jul 2025.