Barrettspark ,
- 21 Dec 2018Received
- 21 Jun 2019Conditional
- 11 Nov 2024Permission expires
- Status
- Appeal decided — granted
- Decision
- Conditional · 21 Jun 2019
- Council
- Galway County Council
- Type
- PERMISSION
- Site
- 1.61 ha
What’s proposed
for a ten-year planning permission for the development of an up to 100MW Battery Energy Storage Facility that will provide energy services to the national grid and will be delivered in 4 no. phases. The development will consist of the construction and operation of up to 34 metal containers to store up to a project total of up to 100MW in sealed battery cells each with entrances, fire suppression systems, heating, ventilation and air conditioning systems. The proposed development includes for inverters, control systems, other electrical components, security lighting and ancillary infrastructure and all associated works including security fencing and ancillary grid infrastructure. Gross floor space of proposed works: 2186.6 sqm
181883 is a planning application to Galway County Council for for a ten-year planning permission for the development of an up to 100MW Battery Energy, received on 21 Dec 2018; permission was granted with conditions on 21 Jun 2019.
Planning details
- Reference
- 181883
- Local authority
- Galway County Council
- Status
- Appeal decided — granted · register status “APPLICATION FINALISED”
- Received
- 21 Dec 2018
- Observations close
- 4 Feb 2019 (closed 2791 days ago)
- Decision due
- 24 Jun 2019 · decided 21 Jun 2019
- Decision
- Conditional on 21 Jun 2019
- Proposed development
- for a ten-year planning permission for the development of an up to 100MW Battery Energy Storage Facility that will provide energy services to the national grid and will be delivered in 4 no. phases. The development will consist of the construction and operation of up to 34 metal containers to store up to a project total of up to 100MW in sealed battery cells each with entrances, fire suppression systems, heating, ventilation and air conditioning systems. The proposed development includes for inverters, control systems, other electrical components, security lighting and ancillary infrastructure and all associated works including security fencing and ancillary grid infrastructure. Gross floor space of proposed works: 2186.6 sqmAs published by the register.
- Site area
- 1.61 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 12 applications within 500 m in the last 5 years
- WithdrawnCashla & Moor , Athenry , Co. Galway
- GrantedCashla Barrettspark to Tonacooleen ,
- AppealedGannow Attimonmore South Attimonbeg Attimonmore North Ballynanulty etc. (See Notices) , Co. Galway
- Appeal decidedBarrettspark , Athenry , Co. Galway
- GrantedCahergowan Summerfield Claregalway Ballygarraun Pollkeen , Cloon Cloonacauneen Pollaghrevagh & Cappanabornia
- GrantedBarrettspark , ESB Telecoms Ltd Compound , Cashla 220k V Substation
- GrantedBallymoneen - Cashla , Ballymoneen Grange East Ballinloughaun Moor Cashla , and Barrettstown Co. Galway
- GrantedCashla Substation & Overhead Transmission Line , Barrettspark and , Oughtagh
Show all 12
Appeal
The register records appeal ABP-304922-19 (status unknown) but we have not matched the ACP case yet.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 353809). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/GalwayCC/AppFileRefDetails/181883/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |