Galway County Council · 221030

Cloonascragh

Approved in Dec 2022. No sign of building yet.

  1. 7 Sept 2022Received
  2. 1 Nov 2022Conditional
  3. 12 Dec 2022Final approval
  4. 11 Dec 2027Approval runs out
Status
Approved
Decision
Conditional · 1 Nov 2022
Council
Galway County Council
Type
PERMISSION
Units
1
Site
154.55 ha

What’s proposed

to refurbish the existing Castlebar-Cloon 110kV overhead line, which is approximately 57km long, and comprises 252no. wooden polesets and 40no. steel angle masts between the existing Castlebar 110kV substation in County Mayo, and the existing Cloon 110kV substation in County Galway. Approximately 20km of the existing circuit is located within the functional area of Galway County Council and approximately 37km in the functional area of Mayo County Council.The proposed uprate development is located in the townlands of Belmont, Carrownageeha, Carrownurlaur, Cloonascragh (Kilbennan), Cloonascragh (Tuam), Cloondarone, Cloonfush, Cloontooa, Kilcreevanty, Killeelaun, Kilmore, Lehid, Liskeevy, Mullagh, Pollacorragune, and Woodquay in County Galway.The works will include:• the replacement (“restringing”) of the existing overhead line circuit conductor and wires with a new higher capacity conductor including installation of a new fibre communication connection; • the replacement of the existing earthwire, including bonding leads, earth leads and vibration dampers; • the replacement of 53no. wooden polesets and 39no. steel masts; • the replacement of hardware, fittings and insulators; • the replacement of crossarms at 50no. wooden polesets and the realignment of crossarms at a further 5no. wooden polesets; • all associated site development works, including foundation upgrade works; • all associated works within the Castlebar 110kV substation and Cloon 110kV substation to accommodate the uprated 110kV overhead line including uprating of the Castlebar bay in Cloon 110kV substation and the Cloon bay in Castlebar 110kV substation; • the replacement of approximately 175m of underground cable at the Castlebar 110kV substation; • all associated temporary site development works to gain access to the existing Structures; and • other temporary associated and ancillary development works required for the purpose of the uprate of the existing circuit. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development

Planning details

Reference
221030
Local authority
Galway County Council
Status
Granted with conditions · register status “APPLICATION FINALISED”
Received
7 Sept 2022
Decision due
1 Nov 2022 · decided 1 Nov 2022
Decision
Conditional on 1 Nov 2022
Site area
154.55 ha from the mapped boundary, not the council's figure

Live near Cloonascragh?

Everything else planned on your street, in one report.

Check my street
Council register ↗

One email to confirm. Unsubscribe in one click.

Nearby 1 · 500 m · 5 years

Distance
Time

Explore this area on the map →

Homes nearby

Zoning

C2.2 — Economic development and employment

Zoned for employment uses. Housing is not the intended use here.

M1 — Metro / rail economic corridor

A high-density mixed-use employment corridor tied to a rail or metro line. Expect the tallest buildings in the area here.

N1.5 — Airport

Tied to the efficient operation and development of the airport under its own plan — which also means aircraft noise contours apply.

N2.1 — Strategic infrastructure

Land tied to a national or strategic asset (airport, port, rail corridor). Uses are controlled by that asset's own plan.

Protections nearby 250 m

  • NIAH-recorded building · 2
    bridge; water pump
  • Recorded monument · 38
    Quarry; Ringfort - rath

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

221030 is a planning application to Galway County Council for to refurbish the existing Castlebar-Cloon 110kV overhead line, which is approximately, received on 7 Sept 2022; permission was granted with conditions on 1 Nov 2022.