Turoe
Approved in Aug 2022. No sign of building yet.
- 4 May 2022Received
- 28 Jun 2022Conditional
- 8 Aug 2022Final approval
- 7 Aug 2027Approval runs out
- Status
- Approved
- Decision
- Conditional · 28 Jun 2022
- Council
- Galway County Council
- Type
- PERMISSION
- Site
- 1,186 m²
What’s proposed
for the proposed development consisting of the re-location and installation of the Turoe Stone, a national monument, within a protective enclosure, with ancillary landscaping works. The corten steel & glazed enclosure is circular, 8.1m in overall diameter and 2.7m in clear height, with a square glass drum topped by a square glazed roof light housing the stone. Three piers in corten steel support the roof disc, creating a covered ambulatory that allows visitors to enjoy the stone. A compacted and well-drained granite grit path allows for the circulation route up to the monument. New corten steel gates are added to the newly formed vehicular & pedestrian entrance with convex stone walls. Provision of 4 no. car spaces is made & a new pedestrian gate made to the adjoining pet farm. Gross floor space of proposed works: 50 sqm
Planning details
- Reference
- 22580
- Local authority
- Galway County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 4 May 2022
- Decision due
- 28 Jun 2022 · decided 28 Jun 2022
- Decision
- Conditional on 28 Jun 2022
- Site area
- 1,186 m² from the mapped boundary, not the council's figure
Nearby 1 · 500 m · 12 months
Homes nearby
Protections nearby 250 m
- Recorded monument · 3
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
22580 is a planning application to Galway County Council for for the proposed development consisting of the re-location and installation of the Turoe, received on 4 May 2022; permission was granted with conditions on 28 Jun 2022.