PlanningRegister.ie
Galway County Council · 2261303

Caheroyn, Caherroyn, Athenry Co. Galway

Approved in Feb 2023. Building started.

What’s proposed

For the development which will consist of: • The demolition of 2 no. single storey dwellings and associated structures along with removal of existing partly demolished house and rubble, • The construction of a mixed use office, enterprise and residential development within 4 no. building blocks, • Building No. 1 will consist of a 3 storey duplex building to accommodate 2 no. home office/start up units and 4 no. 1 bed…

Show all

apartments on the ground floor, and 6 no. 2 bedroom apartments on the first and second floor, • Building No. 2 will consist of a 3 storey duplex building to accommodate 2 no. home office/start up units and 6 no. 1 bedroomed apartments on the ground floor, and 8 no. 2 bedroom apartment units on the first and second floor, • Building No. 3 will consist of a single storey building to accommodate incubator/start up offices. • Building No. 4 will consist of a 3 storey duplex building to accommodate a ground floor Enterprise Centre and 8 no. 2 bed apartments on the first and second floor, • Provision of a new vehicular and pedestrian access from the Caheroyan Road, • Provision of an ESB Sub Station, • Provision of carparking including a number of dedicated electrical charge spaces and ducting to all spaces for future charging points; • Provision of public & private open spaces, bicycle parking, bin storage, site landscaping, play spaces and public lighting; • Provision of landscaping and riverside amenity area and associated drainage swales, • Connection to existing services, revised boundary treatments, footpath connections, signage locations and all associated site development works. A Natura Impact Statement will be submitted to the planning authority with this application.Gross floor space of proposed works 3,857.13sqm

  1. 22 Dec 2022Received
  2. 24 Feb 2023Refused
  3. 11 Apr 2024Final approval
  4. 27 Sept 2024Building started
  5. 10 Apr 2029Approval runs out

Planning details

Status
Building started
Decision
Refused · 24 Feb 2023
Reference
2261303
Received
22 Dec 2022
Site
1.35 ha

12 other applications within 500 m in the last year

Get the full report

Nearby 12 · 500 m · 12 months

Distance
Time
Show all 12

Explore this area on the map →

Homes nearby

Appeal

Appeal ABP-316109-23 (status unknown), not yet matched.

Building started

  • 27 Sept 2024 · Builder told the council work was starting (seven-day notice) SN0011209GC
  • 27 Sept 2024 · Builder told the council work was starting (seven-day notice) SN0011211GC
  • 27 Sept 2024 · Builder told the council work was starting (seven-day notice) SN0011210GC

Zoning

G1 — Open space with recreation

Open space with active recreational amenities — pitches, courts, play areas.

M1 — Metro / rail economic corridor

A high-density mixed-use employment corridor tied to a rail or metro line. Expect the tallest buildings in the area here.

N1.5 — Airport

Tied to the efficient operation and development of the airport under its own plan — which also means aircraft noise contours apply.

N2.1 — Strategic infrastructure

Land tied to a national or strategic asset (airport, port, rail corridor). Uses are controlled by that asset's own plan.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

  • NIAH-recorded building · 2
    bridge; Athenry Heritage Centre
  • Recorded monument · 10
    Castle - Anglo-Norman masonry castle; Church
Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

2261303 is a planning application to Galway County Council for for the development which will consist of: • The demolition of 2 no. single storey, received on 22 Dec 2022; permission was refused on 24 Feb 2023.