  1. 23 Feb 2023Received
  2. 28 Mar 2024Refused
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Refused
Decision
Refused · 28 Mar 2024
Council
Galway County Council
Type
PERMISSION
Site
355.02 ha

What’s proposed

For a ten-year planning permission consisting of: I.) The felling/removal of some 343 hectares of conifer plantation for the purposes of peatland restoration and the establishment of native woodland. ii.) Measures to restore and rehabilitate approximately 281 hectares of Atlantic blanket bog and heathland that is currently planted with lodgepole pine and Sitka spruce forests and managed for commercial forestry. iii.) Conversion of 62 hectares of conifer forestry to native woodland. iv.) Main peatland restoration measures will include tree removal, drain blocking (manual and mechanical) and ground reprofiling. v.) The control of existing invasive species on site and continued control during the restoration works to prevent their spread. vi.) Drain-blocking all existing artificial drainage and artificial land drains currently existing within the peatland restoration areas in order to restore the high water table which is necessary for blanket bog growth. vii.) Provision of silt traps at outflows to block the pathway to the Twelve Bens/Garraun Complex Special Area of Conservation. viii.) Deer fencing to protect 62 hectares of proposed native woodland. ix.) Provision of a Harvest Management Phasing Plan for the proposed project. x.) Provision of new internal access road extending to 1.58 km. xi.) Across the site there will be 4 no. temporary water-crossings constructed in order to acilitate the harvesting of the timber at the site. xii.) Provision of informational signage. xiii.) Resurfacing of up to 8.23 km of existing forestry roads. xiv.) Resurfacing of existing car park to facilitate public access. xv.) Installation of water monitoring stations for real time water monitoring during operations. xvi.) Cutting of roadside trees to improved sightline visibility at site entrance. xvii.) The application is supported by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS)

2360 is a planning application to Galway County Council for for a ten-year planning permission consisting of: I.) The felling/removal of some 343, received on 23 Feb 2023; permission was refused on 28 Mar 2024.

Planning details

Reference
2360
Local authority
Galway County Council
Status
Refused · register status “APPLICATION FINALISED”
Received
23 Feb 2023
Observations close
30 Mar 2023 (closed 1276 days ago)
Decision due
28 Mar 2024 · decided 28 Mar 2024
Decision
Refused on 28 Mar 2024
Proposed development
For a ten-year planning permission consisting of: I.) The felling/removal of some 343 hectares of conifer plantation for the purposes of peatland restoration and the establishment of native woodland. ii.) Measures to restore and rehabilitate approximately 281 hectares of Atlantic blanket bog and heathland that is currently planted with lodgepole pine and Sitka spruce forests and managed for commercial forestry. iii.) Conversion of 62 hectares of conifer forestry to native woodland. iv.) Main peatland restoration measures will include tree removal, drain blocking (manual and mechanical) and ground reprofiling. v.) The control of existing invasive species on site and continued control during the restoration works to prevent their spread. vi.) Drain-blocking all existing artificial drainage and artificial land drains currently existing within the peatland restoration areas in order to restore the high water table which is necessary for blanket bog growth. vii.) Provision of silt traps at outflows to block the pathway to the Twelve Bens/Garraun Complex Special Area of Conservation. viii.) Deer fencing to protect 62 hectares of proposed native woodland. ix.) Provision of a Harvest Management Phasing Plan for the proposed project. x.) Provision of new internal access road extending to 1.58 km. xi.) Across the site there will be 4 no. temporary water-crossings constructed in order to acilitate the harvesting of the timber at the site. xii.) Provision of informational signage. xiii.) Resurfacing of up to 8.23 km of existing forestry roads. xiv.) Resurfacing of existing car park to facilitate public access. xv.) Installation of water monitoring stations for real time water monitoring during operations. xvi.) Cutting of roadside trees to improved sightline visibility at site entrance. xvii.) The application is supported by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS)
As published by the register.
Site area
355.02 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby 1 application within 500 m in the last 5 years

Explore this area on the map →

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    No other designation nearby.

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 363203). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/GalwayCC/AppFileRefDetails/2360/0.

    Source: npad · fetched 18 Sept 2026, 15:44
    SourceLicenceFetchedLink
    npadCC-BY-4.018 Sept 2026, 15:44open