PlanningRegister.ie
Galway County Council · 2461707

Na Foraí Maola Thoir, Barna, Co. Galway

Approved in Mar 2025. No sign of building yet.

Start notices are matched from the national building control register; a start on site can be missed.

What’s proposed

For; 1) decommission an old septic tank, 2) install a new on-site sewage treatment plant, percolation area and all ancillary works and 3) retention of existing dwelling house and garage all on revised site boundary. Previous planning ref. no. 97/383. Gross floor space of work to be retained: 245.00 sqm

  1. 12 Dec 2024Received
  2. 11 Feb 2025Conditional
  3. 24 Mar 2025Final approval
  4. 23 Mar 2030Approval runs out

An email when the builder tells the council work is starting.

Planning details

Status
Approved
Decision
Conditional · 11 Feb 2025
Reference
2461707
Received
12 Dec 2024
Units
1
Site
2,071 m²

13 other applications within 500 m in the last year · 1 open for comments

Get the full report

Nearby 13 · 500 m · 12 months

Distance
Time
Show all 13

Explore this area on the map →

Homes nearby

Zoning

N1.5 — Airport

Tied to the efficient operation and development of the airport under its own plan — which also means aircraft noise contours apply.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

R4 — Residential

Land zoned for housing. Expect infill, extensions and — on larger plots — apartment or scheme applications that accord with the objective.

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

2461707 is a planning application to Galway County Council for for; 1) decommission an old septic tank, 2) install a new on-site sewage treatment, received on 12 Dec 2024; permission was granted with conditions on 11 Feb 2025.