Galway County Council · 2560214

Ballywataire, Dunmore, Co. Galway

Approved in May 2025. No sign of building yet.

Start notices are matched from the national building control register; a start on site can be missed.

  1. 28 Feb 2025Received
  2. 8 Apr 2025Conditional
  3. 20 May 2025Final approval
  4. 19 May 2030Approval runs out

An email when the builder tells the council work is starting.

Planning details

Status
Approved
Decision
Conditional · 8 Apr 2025
Reference
2560214
Received
28 Feb 2025
Units
1
Site
2,453 m²

What’s proposed

To remove from site the existing unauthorized modular home, wastewater treatment system and front boundary steel fence and gateway and then full planning permission sought to construct a dwelling house, domestic garage/fuel storage shed, waste water treatment system and percolation area and all ancillary site works. Gross floor space of proposed works: 265.00 sqm(house), 42.00 sqm(garage)

1 other application within 500 m in the last year

Open the report

Nearby 1 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Homes nearby

Protections nearby 250 m

  • Recorded monument · 3
    Ritual site - holy well; R154158
Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

2560214 is a planning application to Galway County Council for to remove from site the existing unauthorized modular home, wastewater treatment system, received on 28 Feb 2025; permission was granted with conditions on 8 Apr 2025.