FARRANTOOLEEN , STRADBALLY , CO KERRY
- 16 Nov 2020Received
- 19 Jan 2021Conditional
- 22 Feb 2021Final grant
- 21 Feb 2026Permission expires
- Status
- Granted with conditions
- Decision
- Conditional · 19 Jan 2021
- Council
- Kerry County Council
- Type
- PERMISSION
- Site
- 7,265 m²
What’s proposed
CONSTRUCT 2 NO. NEW TREATED WATER STORAGE TANKS, EACH OF WHICH WILL COMPRISE OF AN ABOVE GROUND 14.7M DIAMETER SINGLE-CELLED PRECAST CONCRETE TANK, ANCILLARY STRUCTURES COMPRISING 1 NO. PARTIALLY BURIED VALVE CHAMBER, 1 NO. DE-CHLORINATION SYSTEM AND ASSOCIATED ABOVE-GROUND KIOSK, 1 NO. ABOVE GROUND TELEMETRY KIOSK, 1 NO. UNDERGROUND CONCRETE SCOUR CHAMBER, AND 1 NO. PUMPSTATION AND ABOVE GROUND KIOSK AND OTHER ANCILLARY DEVELOPMENT INCLUDING ASSOCIATED UNDERGROUND PIPE-WORK AND CABLING, OVERFLOW OUTLET TO STRADBALLY STREAM, EXTENSION TO EXISTING HARD- SURFACED INTERNAL CIRCULATION AREA, FENCING, LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. A NATURA IMPACT STATEMENT HAS BEEN PREPARED IN RESPECT OF THE PLANNING APPLICATION
201102 is a planning application to Kerry County Council for cONSTRUCT 2 NO. NEW TREATED WATER STORAGE TANKS, EACH OF WHICH WILL COMPRISE OF AN ABOVE, received on 16 Nov 2020; permission was granted with conditions on 19 Jan 2021.
Planning details
- Reference
- 201102
- Local authority
- Kerry County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 16 Nov 2020
- Observations close
- 21 Dec 2020 (closed 2097 days ago)
- Decision due
- 19 Jan 2021 · decided 19 Jan 2021
- Decision
- Conditional on 19 Jan 2021
- Proposed development
- CONSTRUCT 2 NO. NEW TREATED WATER STORAGE TANKS, EACH OF WHICH WILL COMPRISE OF AN ABOVE GROUND 14.7M DIAMETER SINGLE-CELLED PRECAST CONCRETE TANK, ANCILLARY STRUCTURES COMPRISING 1 NO. PARTIALLY BURIED VALVE CHAMBER, 1 NO. DE-CHLORINATION SYSTEM AND ASSOCIATED ABOVE-GROUND KIOSK, 1 NO. ABOVE GROUND TELEMETRY KIOSK, 1 NO. UNDERGROUND CONCRETE SCOUR CHAMBER, AND 1 NO. PUMPSTATION AND ABOVE GROUND KIOSK AND OTHER ANCILLARY DEVELOPMENT INCLUDING ASSOCIATED UNDERGROUND PIPE-WORK AND CABLING, OVERFLOW OUTLET TO STRADBALLY STREAM, EXTENSION TO EXISTING HARD- SURFACED INTERNAL CIRCULATION AREA, FENCING, LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. A NATURA IMPACT STATEMENT HAS BEEN PREPARED IN RESPECT OF THE PLANNING APPLICATIONAs published by the register.
- Site area
- 7,265 m² from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Full planning report for 52.23996, -10.06095
Zoning, appeals, sold prices, flood and heritage — the whole area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 374903). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/KerryCC/AppFileRefDetails/201102/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |