Lisdargan, Lispole, Dingle
Approved in Dec 2023. Building started.
- 23 Oct 2023Received
- 13 Dec 2023Conditional
- 24 Jan 2024Final approval
- 23 Sept 2024Building started
- 23 Jan 2029Approval runs out
Planning details
- Status
- Building started
- Decision
- Conditional · 13 Dec 2023
- Reference
- 2360254
- Type
- RETENTION
- Received
- 23 Oct 2023
- Units
- 1
- Site
- 2,856 m²
What’s proposed
( 1 ) Retention permission to ( a ) Retain as constructed dwelling house with detached garden shed and (b ) All buildings within revised site boundaries ( 2 ) Full permission to ( a ) renovate and extend existing dwelling house including the addition of a Kitchen / Dining / Living Area at a reduced ground floor level with den area and bedroom en-suite over at first floor level ( b ) demolish existing garden shed and construct a new detached garden shed and ( c ) Decommission existing septic tank system and install a new propriety wastewater system
1 other application within 500 m in the last year
Open the reportNearby 1 · 500 m · 12 months
Homes nearby
Building started
- 23 Sept 2024 · Builder told the council work was starting (opted out of the finish sign-off) CN0119568KY
Protections nearby 250 m
- Recorded monument · 4
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
2360254 is a planning application to Kerry County Council for ( 1 ) Retention permission to ( a ) Retain as constructed dwelling house with detached, received on 23 Oct 2023; permission was granted with conditions on 13 Dec 2023.