Garfinny, Dingle, Co. Kerry
Approved in Sept 2024. No sign of building yet.
Start notices are matched from the national building control register; a start on site can be missed.
- 19 Dec 2023Received
- 27 Aug 2024Conditional
- 30 Sept 2024Final approval
- 29 Sept 2029Approval runs out
Planning details
- Status
- Approved
- Decision
- Conditional · 27 Aug 2024
- Reference
- 2360434
- Received
- 19 Dec 2023
- Further information
- Requested 21 Feb 2024 · received 31 Jul 2024
- Units
- 1
- Site
- 1,218 m²
What’s proposed
For a 88.2sqm, two-storey, split-level (ground and below ground level) extension to the side (east) of the existing 91.9sqm, single-storey detached cottage, maintaining the roof height of the existing cottage. It is also proposed to decommission existing wastewater treatment system on site and install a new wastewater treatment system, install a new patio to the front, re-route the existing driveway together with associated landscaping works
2 other applications within 500 m in the last year
Open the reportNearby 2 · 500 m · 12 months
Homes nearby
Protections nearby 250 m
- Recorded monument · 3
Where this comes from
National planning feed (NPAD), fetched 17 Nov 2026, 23:00.
Source: National Planning Application Database · fetched 17 Nov 2026, 23:00
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 17 Nov 2026, 23:00 | open |
Summary
2360434 is a planning application to Kerry County Council for for a 88.2sqm, two-storey, split-level (ground and below ground level) extension to the, received on 19 Dec 2023; permission was granted with conditions on 27 Aug 2024.