PlanningRegister.ie
Kerry County Council · 2460395

No. 30 Pairc An Callan, Dromneavane, Kenmare Co. Kerry

Approved in Sept 2024. No sign of building yet.

Start notices are matched from the national building control register; a start on site can be missed.

What’s proposed

(a) Construct an extension to the side of the existing dwelling house at ground and first floor levels, (b) make alterations to the existing dwelling house to include alterations to the interior layout, new sliding door to rear, extend canopy roof at the front, etc. and all other associated site works

  1. 19 Jun 2024Received
  2. 9 Aug 2024Conditional
  3. 12 Sept 2024Final approval
  4. 11 Sept 2029Approval runs out

An email when the builder tells the council work is starting.

Planning details

Status
Approved
Decision
Conditional · 9 Aug 2024
Reference
2460395
Received
19 Jun 2024
Units
1
Site
256 m²

7 other applications within 500 m in the last year · 1 open for comments

Get the full report

Nearby 7 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Homes nearby

Zoning

M4 — Major town centre

The main town centre — retail, offices, civic uses, apartments.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

S2 — Sustainable neighbourhood infrastructure

Reserved for the schools, creches, community and health facilities a neighbourhood needs.

Protections nearby 250 m

  • Recorded monument · 2
    Fever hospital; Excavation - miscellaneous
Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

2460395 is a planning application to Kerry County Council for (a) Construct an extension to the side of the existing dwelling house at ground and, received on 19 Jun 2024; permission was granted with conditions on 9 Aug 2024.