  1. 16 Sept 2024Received
  2. 7 Nov 2024Conditional
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Appeal decided — refused
Decision
Conditional · 7 Nov 2024
Council
Kerry County Council
Type
PERMISSION
Units
510
Site
7.02 ha

Live near Clash Road?

Everything else planned on your street, in one report.

Check my street
Council register ↗

What’s proposed

The construction of a residential development of 256 no. residential units with ancillary two storey crèche, landscaping and associated site development works. The proposed development includes the demolition of an existing single-storey dwelling and associated shed and makes provision for 138 no. two storey houses, comprising 88 no. semi-detached units (76 no. 3 bed units and 12 no. 4 bed units) and 50 no. 3 bed terraced units and 118 no. maisonette units over 2 no. storeys (50 no. 1 bed units, 68 no. 2 bed units). Ancillary infrastructure development works will include wastewater infrastructure, surface water attenuation, water utility services, public lighting, bin stores, bicycle stores, 3 no. ESB substations, and all associated site development works. Vehicular access to the development will be via 1 no. new entrance and the reconfiguration of an existing entrance off Clash Road (L2016). The proposed development also includes a separate pedestrian/cycle entrance off Clash Road. The proposal includes dedicated pedestrian and cycling paths traversing the site and setback provision is made along the site’s frontage with Clash Road to facilitate a future cycle infrastructure network

Planning details

Reference
2460695
Local authority
Kerry County Council
Status
Appeal decided — refused · register status “APPLICATION FINALISED”
Received
16 Sept 2024
Observations close
21 Oct 2024 (closed 715 days ago)
Decision due
10 Nov 2024 · decided 7 Nov 2024
Decision
Conditional on 7 Nov 2024
Proposed development
The construction of a residential development of 256 no. residential units with ancillary two storey crèche, landscaping and associated site development works. The proposed development includes the demolition of an existing single-storey dwelling and associated shed and makes provision for 138 no. two storey houses, comprising 88 no. semi-detached units (76 no. 3 bed units and 12 no. 4 bed units) and 50 no. 3 bed terraced units and 118 no. maisonette units over 2 no. storeys (50 no. 1 bed units, 68 no. 2 bed units). Ancillary infrastructure development works will include wastewater infrastructure, surface water attenuation, water utility services, public lighting, bin stores, bicycle stores, 3 no. ESB substations, and all associated site development works. Vehicular access to the development will be via 1 no. new entrance and the reconfiguration of an existing entrance off Clash Road (L2016). The proposed development also includes a separate pedestrian/cycle entrance off Clash Road. The proposal includes dedicated pedestrian and cycling paths traversing the site and setback provision is made along the site’s frontage with Clash Road to facilitate a future cycle infrastructure network
As published by the register.
Site area
7.02 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby 18 · 500 m · 5 years

Show all 18

Explore this area on the map →

Homes nearby

Appeal

Appeal 321298-24 (status unknown), not yet matched.

Zoning

G1 — Open space with recreation

Open space with active recreational amenities — pitches, courts, play areas.

R1 — New residential

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

No mapped flood area nearby.

  • Recorded monument · 2
    Enclosure; R105189

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: npad · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
npadCC-BY-4.018 Sept 2026, 15:44open
Summary

2460695 is a planning application to Kerry County Council for the construction of a residential development of 256 no. residential units with, received on 16 Sept 2024; permission was granted with conditions on 7 Nov 2024.