In the townlands of, Ballygarret Gortanimerisk Knockaderren Knockavallig Knockundervaul Lacka West Lisroe Toor and Trienearagh, near Listowel Co. Kerry
Decision due 26 Nov.
- 21 Aug 2026Received
- 25 Sept 2026Observations closed
- 26 Nov 2026Decision due
- Status
- With the council, no decision yet
- Decision
- Due 26 Nov 2026
- Council
- Kerry County Council
- Type
- PERMISSION
- Site
- 183.28 ha
What’s proposed
We, Circal Trienearagh Solar Limited, intend to apply for permission for development on lands in the townlands of Ballygarret, Gortanimerisk, Knockaderren, Knockavallig, Knockundervaul, Lacka West, Lisroe, Toor and Trienearagh, near Listowel, Co. Kerry (the Proposed Development) which comprises a renewable energy development as defined by The European Union (Planning and Development) (Renewable Energy) Regulations 2025. The Proposed Development comprises the following: I. Construction and operation of up to 576,850 sqm of solar PV arrays on ground-mounted metal frames, with a maximum overall height of up to 2.79 metres. II. Internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor / transformer skid units. III. Up to 23 no. electrical inverter / transformer skid units. IV. Construction and operational access to the site by 16 no. site entrances using 14 no. existing field access points and 2 no. new access points. V. 7 no. temporary construction compounds and ancillary facilities for the duration of the construction phase of the project. VI. Construction of a 110kV / 33 kV transformer compound including an IPP Control Module of 33 sqm, a MV Switchgear Module of 33 sqm, all associated electrical plant and apparatus, 2 no c.18m lightning masts, lighting columns, fencing, parking, wastewater holding tank, rainwater harvesting unit, 33kV underground cabling, and a 110kV under the fence cable connection to the existing Trien 110 kV Substation. VII. 33 kV collector cable network, joint bays and associated works. VIII. Internal access tracks, site landscaping and drainage works, security fencing, CCTV and all associated ancillary site development works. IX. The decommissioning and reinstatement of the solar farm at the end of its operational life, including proposed transformer compound. The application seeks a 10-year permission with an operational lifetime of 40 years from the date of commissioning of the entire solar farm is being sought. A Natura Impact Statement (NIS) has been prepared in respect of the construction, operation and decommissioning of the Proposed Development and accompanies the planning application. Refer to enclosed statutory notices for full development description
Planning details
- Reference
- 2660792
- Local authority
- Kerry County Council
- Status
- With the council, no decision yet · register status “NEW APPLICATION”
- Received
- 21 Aug 2026
- Observations close
- 25 Sept 2026 (closed 45 days ago)
- Decision due
- 26 Nov 2026
- Decision
- Not decided
- Site area
- 183.28 ha from the mapped boundary, not the council's figure
Nearby 2 · 500 m · 5 years
Homes nearby
Protections nearby 250 m
- Recorded monument · 19
Where this comes from
National planning feed (NPAD), fetched 14 Oct 2026, 01:45.
Source: National Planning Application Database · fetched 14 Oct 2026, 01:45
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 14 Oct 2026, 01:45 | open |
Summary
2660792 is a planning application to Kerry County Council for we, Circal Trienearagh Solar Limited, intend to apply for permission for development on, received on 21 Aug 2026; a decision is due by 26 Nov 2026.