The Maltings , Athy , Co. Kildare.
- 27 Apr 2018Received
- 29 Aug 2018Conditional
- 13 Mar 2024Permission expires
- Status
- Appeal decided — granted
- Decision
- Conditional · 29 Aug 2018
- Council
- Kildare County Council
- Type
- PERMISSION
- Site
- 8.21 ha
What’s proposed
a 10 year planning permission for development which will consist of: (1) The demolition of a portion of an existing barley intake building and storage building; (2) The construction of a new malting plant comprising: an energies building (400.5 sqm and 16.6 metres high); a kiln vessel (594 sqm and 10.8 metres high); a steeps building (496.6 sqm and 20.4 metres high); 2 No. germination vessels (830 sqm and 10.2 metres high); a 300 cubic metre process water tank (5.7 metres high); and ancillary overhead conveyors at 11.5 metres above ground level: (3) The construction of a wastewater balance tank (167.3 sqm and 5.7 metres high): (4) The construction of 3 No. combined heat and power units (228 sqm and 7.4 metres high): (5) The construction of a barley intake building (145.7 sqm and 18 metres high); (6) The construction of a heat recovery unit for the Boby Kiln to be located on top of the existing Boby Tower (162 sqm) to a height of 21.6 metres above ground level; (7) The construction of a filter enclosure (60.7 sqm and 14 metres high); (8) The construction of a malt screen housing (65 sqm and 18.0 metres high); (9) The construction of a malt outloading structure with overhead storage bins (174.3 sqm and 23 metres high) with associated overhead conveyors; (10) 2 No. buffer bins (50 sqm and 20.7 metres high); (11) The renovation of Plewman’s House and the construction of a 76sqm board room extension and a 310 sqm administration building extension; (12) The construction of a 29 No. space car park with disabled and electric charging spaces adjacent to Plewman’s House; (13) The construction of an access road, footpath and vehicle entrance from the Woodstock Industrial Estate road; (14) An upgraded surface water management system to include a new surface water attenuation pond; 1 No. surface water screen; 1 No. hydrodynamic grit separator; and 1 No. hydrocarbon interceptor; and (15) All other site development works including the provision of ancillary access roads, hardstands, conveyors and underground services required to facilitate the development. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the Planning Authority, for development
18479 is a planning application to Kildare County Council for a 10 year planning permission for development which will consist of: (1) The demolition, received on 27 Apr 2018; permission was granted with conditions on 29 Aug 2018.
Planning details
- Reference
- 18479
- Local authority
- Kildare County Council
- Status
- Appeal decided — granted · register status “APPLICATION FINALISED”
- Received
- 27 Apr 2018
- Observations close
- 1 Jun 2018 (closed 3039 days ago)
- Decision due
- 25 Sept 2018 · decided 29 Aug 2018
- Decision
- Conditional on 29 Aug 2018
- Proposed development
- a 10 year planning permission for development which will consist of: (1) The demolition of a portion of an existing barley intake building and storage building; (2) The construction of a new malting plant comprising: an energies building (400.5 sqm and 16.6 metres high); a kiln vessel (594 sqm and 10.8 metres high); a steeps building (496.6 sqm and 20.4 metres high); 2 No. germination vessels (830 sqm and 10.2 metres high); a 300 cubic metre process water tank (5.7 metres high); and ancillary overhead conveyors at 11.5 metres above ground level: (3) The construction of a wastewater balance tank (167.3 sqm and 5.7 metres high): (4) The construction of 3 No. combined heat and power units (228 sqm and 7.4 metres high): (5) The construction of a barley intake building (145.7 sqm and 18 metres high); (6) The construction of a heat recovery unit for the Boby Kiln to be located on top of the existing Boby Tower (162 sqm) to a height of 21.6 metres above ground level; (7) The construction of a filter enclosure (60.7 sqm and 14 metres high); (8) The construction of a malt screen housing (65 sqm and 18.0 metres high); (9) The construction of a malt outloading structure with overhead storage bins (174.3 sqm and 23 metres high) with associated overhead conveyors; (10) 2 No. buffer bins (50 sqm and 20.7 metres high); (11) The renovation of Plewman’s House and the construction of a 76sqm board room extension and a 310 sqm administration building extension; (12) The construction of a 29 No. space car park with disabled and electric charging spaces adjacent to Plewman’s House; (13) The construction of an access road, footpath and vehicle entrance from the Woodstock Industrial Estate road; (14) An upgraded surface water management system to include a new surface water attenuation pond; 1 No. surface water screen; 1 No. hydrodynamic grit separator; and 1 No. hydrocarbon interceptor; and (15) All other site development works including the provision of ancillary access roads, hardstands, conveyors and underground services required to facilitate the development. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the Planning Authority, for developmentAs published by the register.
- Site area
- 8.21 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 30 applications within 500 m in the last 5 years
- GrantedIn the townlands of Woodstock South Ballaghmoon Bennetsbridge Castleroe East Castleroe West Crooket Gorteenvacan Knocknagee , Knockroe Maganey Lower Maganey Upper Newtownallen , Prumpelstown Upper Rosbran and Tonlegee within County Kildare
- GrantedKilkenny Road , Athy , Co. Kildare
- Open23 Duke Street , Athy , Co. Kildare
- GrantedKilkenny Road , Athy , Kildare
- Granted53 Páirc Bhride , Athy , Co. Kildare
- RefusedUnit 1 Block C , Athy Business Campus , Kilkenny Road
- WithdrawnUnit 1 Block C Athy Business Campus , Kilkenny Road , Athy
- Appeal decided12 & 13 Pairc Bhride , Athy , Co. Kildare
Show all 30
- WithdrawnInver Service Station , Woodstock Street Athy , Co. Kildare
- CommencedKARE , Shrewleen Lane , Athy
- GrantedMinch Malt , Upper William Street , Athy
- GrantedAthy Business Campus , Kilkenny Road , Athy
- RefusedWoodstock South , Athy , Co. Kildare
- CommencedBlackparks , Athy , Co. Kildare
- GrantedAthy Recreational Community Hall , Kilkenny Road , Athy
- Granted39 Duke Street , Athy , Co. Kildare.
- Granted3 Saint Dominics Park , Athy , Co. Kildare.
- GrantedThe Maltings , Athy , Co. Kildare
- Withdrawn3 Saint Dominics Park , Athy , Co. Kildare.
- Withdrawn3 Saint Dominics Park , Athy , Co. Kildare
- Withdrawn3 Saint Dominics Park , Athy , Co. Kildare R14 DW62.
- GrantedDominican Lands , Athy , Co. Kildare.
- WithdrawnDominican Lands , Athy , Co. Kildare.
- Refused12 Pairc Bhride , Athy , Co. Kildare
- Granted11 William Street , Athy , Co. Kildare.
- CommencedUnit 4 Woodstock Industrial Estate , Athy , Co. Kildare.
- WithdrawnUnit 4 , Woodstock Industrial Estate , Athy
- Refused39 Duke Street , Athy , Co. Kildare
- Withdrawn39 Duke Street , Athy , Co. Kildare.
- GrantedSt Annes , Upper William Street , Athy Co. Kildare.
Homes nearby
- SoldApartment 36, Block C, The Harbour, Nelson Street, Athy, Co. Kildare
- Sold2 Woodstock Close, Athy, Co. Kildare
- Withdrawn22 Block A The Harbour, Athy, Co. Kildare, R14 PN47
- SoldApartment 38, Block A, The Harbour, Nelson Street, Athy, Co. Kildare
- For sale37 Block A The Harbour, Nelson Street, Athy, Co. Kildare, R14 FW30
- SoldApartment 39, Block A, The Harbour, Nelson Street, Athy, Co. Kildare
Appeal
The register records appeal 302630-18 (status unknown) but we have not matched the ACP case yet.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
- Natural Heritage Area (incl. proposed) · 1
- Radon risk area · 1
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 123877). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/KildareCC/AppFileRefDetails/18479/0.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |