PlanningRegister.ie
Kildare County Council · 20382

Ovidstown, Ballyvoneen, Enfield

Declared invalid.

  1. 14 Apr 2020Received
  2. 19 May 2020Observations closed

Earlier approval here ran out with no sign of building: 1894 (2019)

Status
Withdrawn or invalid
Decision
Not yet
Council
Kildare County Council
Type
PERMISSION
Site
13.87 ha

Live near Ovidstown?

Everything else planned on your street, in one report.

Check my street
Council register ↗

What’s proposed

to amend application 18/94. Amendments proposed include: No change to the perimeter fence or CCTV points; Change from mesh fence to deer fencing in compliance with Condition 13; Solar panel height increased from 2.3m to 2.5m; Angle span amended from 20-30 degrees to 10-40 degrees. Panels layout slightly reconfigured to account for changes in the height; Interior access track decreased in land disturbance from 3,172sqm to 1,109sqm; Increase of the temporary construction compound from 2,452sqm to 3,000sqm; Removal of the 750sqm Energy Storage Area; Replacement of five solar farm substations with two slightly larger substations with a shared hardstanding area, a decrease from 780sqm to 448sq; Removal of a section of solar panels from the northern extent of the Application Site; and an overall decrease in ground disturbance at the construction stage by 3,145sqm

Planning details

Reference
20382
Local authority
Kildare County Council
Status
Withdrawn or invalid · register status “INCOMPLETED APPLICATION”
Received
14 Apr 2020
Observations close
19 May 2020 (closed 2334 days ago)
Decision due
No due date published
Decision
Not decided
Proposed development
to amend application 18/94. Amendments proposed include: No change to the perimeter fence or CCTV points; Change from mesh fence to deer fencing in compliance with Condition 13; Solar panel height increased from 2.3m to 2.5m; Angle span amended from 20-30 degrees to 10-40 degrees. Panels layout slightly reconfigured to account for changes in the height; Interior access track decreased in land disturbance from 3,172sqm to 1,109sqm; Increase of the temporary construction compound from 2,452sqm to 3,000sqm; Removal of the 750sqm Energy Storage Area; Replacement of five solar farm substations with two slightly larger substations with a shared hardstanding area, a decrease from 780sqm to 448sq; Removal of a section of solar panels from the northern extent of the Application Site; and an overall decrease in ground disturbance at the construction stage by 3,145sqm
As published by the register.
Site area
13.87 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby 2 · 500 m · 5 years

Explore this area on the map →

Homes nearby

Zoning

Not zoned in the current plan.

Protections nearby 250 m

No mapped flood area nearby.

  • Radon risk area · 2
    About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels

Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: npad · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
npadCC-BY-4.011 Sept 2026, 18:51open
Summary

20382 is a planning application to Kildare County Council for to amend application 18/94. Amendments proposed include: No change to the perimeter, received on 14 Apr 2020; the file is recorded as incompleted application.