Landenstown and Fleshtown , Digby Bridge , Sallins
Data updated 13 Sept 2026 · register lag up to 7 days · sources & freshness
211353 is a planning application for permission at Landenstown and Fleshtown , Digby Bridge , Sallins, received by Kildare County Council on 21 Sept 2021 and first seen by Planning Register on 11 Sept 2026. The application describes: the demolition of a single storey structure to the rear of the existing single storey dwelling, the erection of a single storey extension to the rear, and a single storey extension to the side and front of the existing single storey dwelling, the inclusion of two new skylights to the existing dwelling, the raising of a portion of the roadside boundary wall, the incorporation of a new sliding gate at the existing site entrance, an effluent treatment system and percolation area, and associated site works. The proposed development is adjacent to a protected structure, RPS Ref. No. B14-46, Digby Bridge (and Lock). The council granted permission on 14 Dec 2021, with conditions. The five-week observation window closed on 26 Oct 2021. Within 500 m there are 4 other decided applications in the last five years.
Proposal
the demolition of a single storey structure to the rear of the existing single storey dwelling, the erection of a single storey extension to the rear, and a single storey extension to the side and front of the existing single storey dwelling, the inclusion of two new skylights to the existing dwelling, the raising of a portion of the roadside boundary wall, the incorporation of a new sliding gate at the existing site entrance, an effluent treatment system and percolation area, and associated site works. The proposed development is adjacent to a protected structure, RPS Ref. No. B14-46, Digby Bridge (and Lock).
- Status
- APPLICATION FINALISED
- Decision
- Conditional on 14 Dec 2021
- Final grant
- 26 Jan 2022
- Permission expires
- 25 Jan 2027
- Site (from polygon)
- 1,931 m²
- Location precision
- site (coords_polygon)
Timeline
- 21 Sept 2021New applicationObservation window closed 26 Oct 2021
- 11 Nov 2021Further information requested
- 26 Nov 2021Further information received
- 14 Dec 2021DecisionAppeal window closed 20 Jan 2022

Full planning report for 53.26101, -6.70662
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
- Natural Heritage Area (incl. proposed) · 1
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 128844). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/KildareCC/AppFileRefDetails/211353/0.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |