Great Connell , Newbridge , Co. Kildare.
Data updated 13 Sept 2026 · register lag up to 7 days · sources & freshness
211780 is a planning application for permission at Great Connell , Newbridge , Co. Kildare., received by Kildare County Council on 17 Dec 2021 and first seen by Planning Register on 11 Sept 2026. The application describes: works to the existing Murphy International Limited Headquarters to accommodate two new industrial buildings, comprising a Steel Fabrication building and a Pipe Ancillary building, and associated development and works. The Steel Fabrication Building of 2,495 sqm is 13.1 metres in height and accommodates a fabrication area of 2,229 sqm and a staff welfare area of 133 sqm at ground floor level, and an ancillary office of 133 sqm at first floor level. The Pipe Ancillary Building of 760 sqm is single storey and 9.3 metres in height, and will accommodate workshops. Solar photovoltaic panels are proposed on the roofs of both buildings. It is proposed to demolish 4 No. existing buildings including an Office (300sqm), Lean-to Warehouse (240 sqm), Warehouse (415 sqm), and a Storage Barn (112 sqm), and to demolish the existing boundary walls on Great Connell Road and on part of the existing access road. It is proposed to upgrade the existing access road to provide a 7.5 metre carriageway, 1.5 metre grass verge, 2 metre cycle lane, 2 metre footpaths, tree planting and a 2.5 metre boundary wall to the subject site, and to upgrade the boundary on Great Connell Road by removing the existing entrances and providing a 1.5 metre grass verge, 2 metre cycle lane, 2 metre foot path, tree planting and a 2.5 metre acoustic timber fence. It is proposed to provide 84 No. car parking spaces and 33 No. bike parking spaces, 3 No. signs of 5.2 sqm each are proposed; 1 No. on the southwest elevation of the Steel Fabrication Building, 1 No. on the northeast elevation of the Pipe Ancillary Building, and 1 No. on the northwest elevation of the Pipe Ancillary Building. The existing yard will be extended by 0.9 ha. These and all ancillary works including the regrading of an existing drainage ditch, all water infrastructure, internal roads, and landscaping are proposed on a site of 4.7 ha. The council granted permission on 25 May 2022, with conditions. The five-week observation window closed on 31 Jan 2022. Within 500 m there are 9 other decided applications in the last five years.
Proposal
works to the existing Murphy International Limited Headquarters to accommodate two new industrial buildings, comprising a Steel Fabrication building and a Pipe Ancillary building, and associated development and works. The Steel Fabrication Building of 2,495 sqm is 13.1 metres in height and accommodates a fabrication area of 2,229 sqm and a staff welfare area of 133 sqm at ground floor level, and an ancillary office of 133 sqm at first floor level. The Pipe Ancillary Building of 760 sqm is single storey and 9.3 metres in height, and will accommodate workshops. Solar photovoltaic panels are proposed on the roofs of both buildings. It is proposed to demolish 4 No. existing buildings including an Office (300sqm), Lean-to Warehouse (240 sqm), Warehouse (415 sqm), and a Storage Barn (112 sqm), and to demolish the existing boundary walls on Great Connell Road and on part of the existing access road. It is proposed to upgrade the existing access road to provide a 7.5 metre carriageway, 1.5 metre grass verge, 2 metre cycle lane, 2 metre footpaths, tree planting and a 2.5 metre boundary wall to the subject site, and to upgrade the boundary on Great Connell Road by removing the existing entrances and providing a 1.5 metre grass verge, 2 metre cycle lane, 2 metre foot path, tree planting and a 2.5 metre acoustic timber fence. It is proposed to provide 84 No. car parking spaces and 33 No. bike parking spaces, 3 No. signs of 5.2 sqm each are proposed; 1 No. on the southwest elevation of the Steel Fabrication Building, 1 No. on the northeast elevation of the Pipe Ancillary Building, and 1 No. on the northwest elevation of the Pipe Ancillary Building. The existing yard will be extended by 0.9 ha. These and all ancillary works including the regrading of an existing drainage ditch, all water infrastructure, internal roads, and landscaping are proposed on a site of 4.7 ha.
- Status
- APPLICATION FINALISED
- Decision
- Conditional on 25 May 2022
- Final grant
- 30 Jun 2022
- Permission expires
- 29 Jun 2027
- Site (from polygon)
- 4.78 ha
- Location precision
- site (coords_polygon)
Timeline
- 17 Dec 2021New applicationObservation window closed 31 Jan 2022
- 16 Feb 2022Further information requested
- 29 Apr 2022Further information received
- 25 May 2022DecisionAppeal window closed 22 Jun 2022

Full planning report for 53.17734, -6.77638
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
- Radon risk area · 1
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 128808). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/KildareCC/AppFileRefDetails/211780/0.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |