Mariavilla Townland , Co. Kildare.
Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness
221213 is a planning application for permission at Mariavilla Townland , Co. Kildare., received by Kildare County Council on 10 Oct 2022 and first seen by Planning Register on 11 Sept 2026. The application describes: for the development of a portion of the Maynooth Outer Orbital Road (MOOR) in the townland of Mariavilla, Co. Kildare. The development will consist of: 1. Provision of approximately 200m of new portion of distributor road comprising of 7.0m carriageway with footpaths, cycle tracks and grass verges. All associated utilities and public lighting including storm water drainage with SuDS treatment and attenuation. This new road section with pedestrian and cycle infrastructure will tie in with existing infrastructure just east of the roundabout which provides access to the Maynooth Community College and Moyglare Hall Estate. 2. Provision of a new bridge structure comprising the following: (i) An integral 50m single span bridge at Moyglare Hall over the River Rye Water to connect with existing road infrastructure in County Kildare and associated floodplain works and embankments. (ii) The bridge will include pedestrian and cycle facilities. (iii) Extension of the water mains assets to serve new developments in Maynooth Environs. 3. Provision of site landscaping, public lighting, site services and all associated site development works. 4. A Natura Impact Statement (NIS) and Environmental Impact Assessment Report (EIAR) has been included with this application. Revised by Significant Further Information which consists of - Amendment of the application site boundary to the southern side of the proposed new bridge. - Revised Engineering Details. - Revision to the Construction and Demolition Waste Management Plan. - Revision to the Construction and Environmental Management Plan. - A revised Site Specific Flood Risk Assessment. - Revisions to the Environmental Impact Assessment Report. - Revisions to the Natura Impact Statement. - Revised Ecological Assessment including a dedicated bat roost suitability survey. - Revisions to the Landscape and Visual Impact Assessment including new photomontages. - Revised Surface Water Drainage Details. - Revised Landscape Masterplan. No decision has been made yet; the council's decision is due by 21 Jun 2023. The five-week observation window closed on 14 Nov 2022. The register records an appeal (ABP-317586-23), decided: withdrawn. Within 500 m there are 8 other decided applications in the last five years.
Proposal
for the development of a portion of the Maynooth Outer Orbital Road (MOOR) in the townland of Mariavilla, Co. Kildare. The development will consist of: 1. Provision of approximately 200m of new portion of distributor road comprising of 7.0m carriageway with footpaths, cycle tracks and grass verges. All associated utilities and public lighting including storm water drainage with SuDS treatment and attenuation. This new road section with pedestrian and cycle infrastructure will tie in with existing infrastructure just east of the roundabout which provides access to the Maynooth Community College and Moyglare Hall Estate. 2. Provision of a new bridge structure comprising the following: (i) An integral 50m single span bridge at Moyglare Hall over the River Rye Water to connect with existing road infrastructure in County Kildare and associated floodplain works and embankments. (ii) The bridge will include pedestrian and cycle facilities. (iii) Extension of the water mains assets to serve new developments in Maynooth Environs. 3. Provision of site landscaping, public lighting, site services and all associated site development works. 4. A Natura Impact Statement (NIS) and Environmental Impact Assessment Report (EIAR) has been included with this application. Revised by Significant Further Information which consists of - Amendment of the application site boundary to the southern side of the proposed new bridge. - Revised Engineering Details. - Revision to the Construction and Demolition Waste Management Plan. - Revision to the Construction and Environmental Management Plan. - A revised Site Specific Flood Risk Assessment. - Revisions to the Environmental Impact Assessment Report. - Revisions to the Natura Impact Statement. - Revised Ecological Assessment including a dedicated bat roost suitability survey. - Revisions to the Landscape and Visual Impact Assessment including new photomontages. - Revised Surface Water Drainage Details. - Revised Landscape Masterplan
- Status
- WITHDRAWN
- Decision
- N/a
- Site (from polygon)
- 3,874 m²
- Location precision
- site (coords_polygon)
Timeline
- 10 Oct 2022Decision
- 10 Oct 2022New applicationObservation window closed 14 Nov 2022
- 1 Dec 2022Further information requested
- 27 Apr 2023Further information received
- 17 Jul 2023Appeal lodged

Full planning report for 53.39489, -6.59251
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
The register records appeal ABP-317586-23 (status unknown) but we have not matched the ACP case yet.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
- Radon risk area · 1
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 130895). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/KildareCC/AppFileRefDetails/221213/0.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |