Planning Register
Kildare County Council · 221443 · PERMISSION

American Fruits and Flavors Ireland DAC , Townparks Industrial Estate , Athy

Data updated 13 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 5 Dec 2022We first saw it 11 Sept 2026, 18:51 (1377 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

221443 is a planning application for permission at American Fruits and Flavors Ireland DAC , Townparks Industrial Estate , Athy, received by Kildare County Council on 5 Dec 2022 and first seen by Planning Register on 11 Sept 2026. The application describes: 1. The demolition of an existing 9m high warehouse (1,770 sqm) and existing ancillary buildings (692 sqm) and infrastructure. 2. The construction of new two storey 14m high production building incorporating warehouse space, food process areas, loading and unloading facilities, staff offices and toilets, plant rooms, roof mounted solar panels, external elevation logo signage. The building has a gross floor area of 7,495 sqm over two floors (Ground floor 5,657 sqm and first floor area 1,838 sqm). 3. The demolition of an existing effluent treatment plant (144 sqm compound) and reconstruction of new treatment plant (952 sqm compound). 4. The installation of a sprinkler storage tank (113 sqm), a glycol tank (23 sqm) and construction of an associated pump house (41 sqm). 5. The installation of food and ethanol silos. 6. Construction of a new gated exit onto local road L8068 and security hut 6 sqm. 7. Construction of a new ESB substation and undergrounding of existing ESB power lines. 8. Amendments to the existing stormwater drainage system. 9. Provision of associated site infrastructure including electric vehicle parking spaces; cycle parking and shelter 20 sqm; tanker unloading bund; refrigeration and air conditioning plant and equipment; raised external plant deck (317 sqm); connections/upgrades to existing services; hard and soft landscaping; boundary treatments; external lighting and all other associated and ancillary development and works above and below ground level to complete the project. 10. Current operational hours of the entire facility are 7 a.m. to 4.30 p.m. It is proposed that the hours of operation would increase to 24 hours with the use of shifts. The facility will not be operational on Sundays or Bank holidays. This would apply to both the existing and the above proposed extension. 11. The planning application is accompanied by an Environmental Impact Assessment Report and a Natura Impact Assessment. Revised by Significant Further Information: a) Changes to the design of the building including adjustments to the height of the building so it now ranges from 10m to 14.5m at its highest point; b) Changes to the finishing and screening materials for the proposed building and associated infrastructure. c) Revised plans illustrating items “a” and “b” including a “Materials” document illustrating the specification and location of the finishing materials and physical samples of the finishing materials proposed on the façade of the r. The council granted permission on 17 Jul 2023, with conditions. The five-week observation window closed on 18 Jan 2023. Within 500 m there are 4 other decided applications in the last five years.

Appeal window closes 14 Aug 2023 closed 1126 days ago
4 weeks from the council's decision (17 Jul 2023) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

1. The demolition of an existing 9m high warehouse (1,770 sqm) and existing ancillary buildings (692 sqm) and infrastructure. 2. The construction of new two storey 14m high production building incorporating warehouse space, food process areas, loading and unloading facilities, staff offices and toilets, plant rooms, roof mounted solar panels, external elevation logo signage. The building has a gross floor area of 7,495 sqm over two floors (Ground floor 5,657 sqm and first floor area 1,838 sqm). 3. The demolition of an existing effluent treatment plant (144 sqm compound) and reconstruction of new treatment plant (952 sqm compound). 4. The installation of a sprinkler storage tank (113 sqm), a glycol tank (23 sqm) and construction of an associated pump house (41 sqm). 5. The installation of food and ethanol silos. 6. Construction of a new gated exit onto local road L8068 and security hut 6 sqm. 7. Construction of a new ESB substation and undergrounding of existing ESB power lines. 8. Amendments to the existing stormwater drainage system. 9. Provision of associated site infrastructure including electric vehicle parking spaces; cycle parking and shelter 20 sqm; tanker unloading bund; refrigeration and air conditioning plant and equipment; raised external plant deck (317 sqm); connections/upgrades to existing services; hard and soft landscaping; boundary treatments; external lighting and all other associated and ancillary development and works above and below ground level to complete the project. 10. Current operational hours of the entire facility are 7 a.m. to 4.30 p.m. It is proposed that the hours of operation would increase to 24 hours with the use of shifts. The facility will not be operational on Sundays or Bank holidays. This would apply to both the existing and the above proposed extension. 11. The planning application is accompanied by an Environmental Impact Assessment Report and a Natura Impact Assessment. Revised by Significant Further Information: a) Changes to the design of the building including adjustments to the height of the building so it now ranges from 10m to 14.5m at its highest point; b) Changes to the finishing and screening materials for the proposed building and associated infrastructure. c) Revised plans illustrating items “a” and “b” including a “Materials” document illustrating the specification and location of the finishing materials and physical samples of the finishing materials proposed on the façade of the r

Status
APPLICATION FINALISED
Decision
Conditional on 17 Jul 2023
Final grant
18 Aug 2023
Permission expires
17 Aug 2028
Site (from polygon)
2.76 ha
Location precision
site (coords_polygon)

Timeline

  • 5 Dec 2022
    New application
    Observation window closed 18 Jan 2023
  • 7 Feb 2023
    Further information requested
  • 18 May 2023
    Further information received
  • 17 Jul 2023
    Decision
    Appeal window closed 14 Aug 2023

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 52.99961, -6.99795

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    • Natural Heritage Area (incl. proposed) · 1
      Grand Canal
    • Radon risk area · 1
      About 1 in 10 homes in this area is likely to have high radon levels

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 128966). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/KildareCC/AppFileRefDetails/221443/0.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open