Porterstown , Kilteel Lower , Kill
Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness
23276 is a planning application for permission at Porterstown , Kilteel Lower , Kill, received by Kildare County Council on 20 Mar 2023 and first seen by Planning Register on 11 Sept 2026. The application describes: for a second phase of the existing grid system services facility within the existing grid system services facility within the existing site area of c1.95 hectares, which was granted via reference number 18/247. The second phase will utilise all existing infrastructure, including the EirGrid gird connection infrastructure, site roads, 110kV substation, compounds, and all ancillary services. The proposed new works will consist of the installation and operation of battery energy units, including 1 no. customer switchgear container which will be connected to the national grid, via the existing infrastructure ,electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary infrastructure on land at. The council granted permission on 11 May 2023, with conditions. The five-week observation window closed on 24 Apr 2023. Within 500 m there are 2 other decided applications in the last five years.
Proposal
for a second phase of the existing grid system services facility within the existing grid system services facility within the existing site area of c1.95 hectares, which was granted via reference number 18/247. The second phase will utilise all existing infrastructure, including the EirGrid gird connection infrastructure, site roads, 110kV substation, compounds, and all ancillary services. The proposed new works will consist of the installation and operation of battery energy units, including 1 no. customer switchgear container which will be connected to the national grid, via the existing infrastructure ,electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary infrastructure on land at
- Status
- APPLICATION FINALISED
- Decision
- Conditional on 11 May 2023
- Final grant
- 10 Jul 2023
- Permission expires
- 9 Jul 2028
- Site (from polygon)
- 2.28 ha
- Location precision
- site (coords_polygon)
Timeline
- 20 Mar 2023New applicationObservation window closed 24 Apr 2023
- 11 May 2023DecisionAppeal window closed 8 Jun 2023

Full planning report for 53.24600, -6.54154
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
- EPA-licensed facility · 2
- Radon risk area · 1
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 132715). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/KildareCC/AppFileRefDetails/23276/0.
Source: npad · fetched 11 Sept 2026, 18:51