23567 is a planning application for permission at Brannockstown Brownstown Carnalway Coghlanstown West , Corbally Delamain Dunnstown Gaganstown Greenhills , Harristown Hillsborough Moorhill & Rochestown, received by Kildare County Council on 26 May 2023 and first seen by Planning Register on 11 Sept 2026. The application describes: 10 Year Planning Permission for a solar farm with a total area of circa 246 hectares in the townlands of Brannockstown, Brownstown, Carnalway, Coghlanstown West, Corbally, Delamain, Dunnstown, Gaganstown, Greenhills, Harristown, Hillsborough, Moorhill and Rochestown in County Kildare. The solar farm will consist of solar photovoltaic panels with a surface area of 1,130,000m2 on ground mounted frames, 40 no. single storey electrical inverter/transformer stations, 4 no. single storey spare parts containers, 19 no. Ring Main Units, 9 no. weather stations underground electrical ducting and cabling within the development site, private lands and within the L6063, L2032, L6071, R448, L6072, R412, L6074, L6047 and R413 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 5 no. stream and drain deck crossings, temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via entrances from the R412, R413, L6044, L6047 and L6063. The solar farm will have a maximum export capacity of circa 210 megawatts. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. Part of the proposed development is situated within the demesne land of Harristown House which contains Protected Structures, but no works are proposed to these Protected Structures but no works are proposed to these Protected Structures. Revised by significant Further Information consisting of revised site layout plans to reduce panelled areas in Parcels 1 and 2, relocation of meteorological mast in Parcel 1 and all associated landscaping and ancillary works. The council granted permission on 28 Nov 2023, with conditions. The five-week observation window closed on 30 Jun 2023. The register records an appeal (ABP-318758-24), decided: conditional. Within 500 m there are 5 other decided applications in the last five years.
Proposal
10 Year Planning Permission for a solar farm with a total area of circa 246 hectares in the townlands of Brannockstown, Brownstown, Carnalway, Coghlanstown West, Corbally, Delamain, Dunnstown, Gaganstown, Greenhills, Harristown, Hillsborough, Moorhill and Rochestown in County Kildare. The solar farm will consist of solar photovoltaic panels with a surface area of 1,130,000m2 on ground mounted frames, 40 no. single storey electrical inverter/transformer stations, 4 no. single storey spare parts containers, 19 no. Ring Main Units, 9 no. weather stations underground electrical ducting and cabling within the development site, private lands and within the L6063, L2032, L6071, R448, L6072, R412, L6074, L6047 and R413 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 5 no. stream and drain deck crossings, temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via entrances from the R412, R413, L6044, L6047 and L6063. The solar farm will have a maximum export capacity of circa 210 megawatts. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. Part of the proposed development is situated within the demesne land of Harristown House which contains Protected Structures, but no works are proposed to these Protected Structures but no works are proposed to these Protected Structures. Revised by significant Further Information consisting of revised site layout plans to reduce panelled areas in Parcels 1 and 2, relocation of meteorological mast in Parcel 1 and all associated landscaping and ancillary works
- Status
- APPLICATION FINALISED
- Decision
- Conditional on 28 Nov 2023
- Final grant
- 20 Aug 2024
- Permission expires
- 19 Aug 2029
- Site (from polygon)
- 245.98 ha
- Location precision
- site (coords_polygon)
Timeline
- 26 May 2023New applicationObservation window closed 30 Jun 2023
- 19 Jul 2023Further information requested
- 24 Oct 2023Further information received
- 28 Nov 2023DecisionAppeal window closed 4 Jan 2024
- 2 Jan 2024Appeal lodged

Full planning report for 53.13872, -6.68137
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
The register records appeal ABP-318758-24 (status unknown) but we have not matched the ACP case yet.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
- Natural Heritage Area (incl. proposed) · 1
- Radon risk area · 1
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 133490). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/KildareCC/AppFileRefDetails/23567/0.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |