Planning Register
Kildare County Council · 2360077 · PERMISSION

Lands at Nurney Road (R415) , Greyabbey (townland) Kildare , Co. Kildare

Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 31 Jul 2023We first saw it 11 Sept 2026, 18:51 (1139 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

2360077 is a planning application for permission at Lands at Nurney Road (R415) , Greyabbey (townland) Kildare , Co. Kildare, received by Kildare County Council on 31 Jul 2023 and first seen by Planning Register on 11 Sept 2026. The application describes: for a 7 year planning permission for development on a site of c. 23.4 hectares bounded generally by the M7/M7 Junction no. 13 to the north, residential development under construction (‘Grey Abbey View’) to the south, and the R415 to the east and undeveloped agricultural lands to the west. The development will consist of the construction of 2 no. light industrial buildings of c.61,472 sq. m (for the purpose of timber frame/light gauge steel manufacturing) A) All site clearance and enabling works required to facilitate the development; B) Building A (Factory unit A) will comprise c. 38,124 sq. m GFA) - height of c.17.1 metres (with a partial cladding element extending 1m above roofline on elevations up to 18.1m) and which includes 2,185 sq. m of support and staff welfare facilities, kitchen and dining facilities, warehouse/storage space, and ancillary office space at ground and first floor levels, water tanks, recycling area along with signage on elevations (2 no. types); C) Building B (Factory unit B) will comprise c. 23,348 sq. m GFA) - height of c.17.1 metres (with a partial cladding element extending 1m above roofline on elevations up to 18.1m) and which includes c. 2,185 sq. m of support and staff welfare facilities, kitchen and dining facilities, warehouse/storage space, and ancillary office space at ground and first floor level with signage on elevations (2 no. types); D) Provision of yards and recycling areas, along with loading bays, waste compactor and gated access points, and 2 no. ESB substations, (each with an overall GFA of 42.8 sqm) and the provision of 2 no. single storey security guard houses (each with a GFA of 29.8sqm); E) Access to the unit will be provided via a revised entrance onto the R415 and the provision of 622 no. car parking spaces, parking for 80 trucks/trailers, and 622 no. bicycle spaces; F) The development includes landscaping, boundary treatments, photovoltaic panels at roof level, entrance barriers, site lighting, and all associated site development works, including underground foul and storm water drainage services and attenuation areas, internal drainage diversions, culverts and all ancillary works; G) The development also consists of the reprofiling of the subject site to include an increase of ground levels at the site by up to circa 3m. The increase in ground levels will be facilitated through the importation of approximately 250,000m3 of infill material. For the avoidance of doubt, the imported infill material requi. The council granted permission on 25 Apr 2024, with conditions. The five-week observation window closed on 4 Sept 2023. Within 500 m there are 7 other decided applications in the last five years.

Appeal window closes 23 May 2024 closed 843 days ago
4 weeks from the council's decision (25 Apr 2024) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

for a 7 year planning permission for development on a site of c. 23.4 hectares bounded generally by the M7/M7 Junction no. 13 to the north, residential development under construction (‘Grey Abbey View’) to the south, and the R415 to the east and undeveloped agricultural lands to the west. The development will consist of the construction of 2 no. light industrial buildings of c.61,472 sq. m (for the purpose of timber frame/light gauge steel manufacturing) A) All site clearance and enabling works required to facilitate the development; B) Building A (Factory unit A) will comprise c. 38,124 sq. m GFA) - height of c.17.1 metres (with a partial cladding element extending 1m above roofline on elevations up to 18.1m) and which includes 2,185 sq. m of support and staff welfare facilities, kitchen and dining facilities, warehouse/storage space, and ancillary office space at ground and first floor levels, water tanks, recycling area along with signage on elevations (2 no. types); C) Building B (Factory unit B) will comprise c. 23,348 sq. m GFA) - height of c.17.1 metres (with a partial cladding element extending 1m above roofline on elevations up to 18.1m) and which includes c. 2,185 sq. m of support and staff welfare facilities, kitchen and dining facilities, warehouse/storage space, and ancillary office space at ground and first floor level with signage on elevations (2 no. types); D) Provision of yards and recycling areas, along with loading bays, waste compactor and gated access points, and 2 no. ESB substations, (each with an overall GFA of 42.8 sqm) and the provision of 2 no. single storey security guard houses (each with a GFA of 29.8sqm); E) Access to the unit will be provided via a revised entrance onto the R415 and the provision of 622 no. car parking spaces, parking for 80 trucks/trailers, and 622 no. bicycle spaces; F) The development includes landscaping, boundary treatments, photovoltaic panels at roof level, entrance barriers, site lighting, and all associated site development works, including underground foul and storm water drainage services and attenuation areas, internal drainage diversions, culverts and all ancillary works; G) The development also consists of the reprofiling of the subject site to include an increase of ground levels at the site by up to circa 3m. The increase in ground levels will be facilitated through the importation of approximately 250,000m3 of infill material. For the avoidance of doubt, the imported infill material requi

Status
APPLICATION FINALISED
Decision
Conditional on 25 Apr 2024
Final grant
18 Jun 2024
Permission expires
17 Jun 2031
Site (from polygon)
23.57 ha
Location precision
site (coords_polygon)

Timeline

  • 31 Jul 2023
    New application
    Observation window closed 4 Sept 2023
  • 22 Sept 2023
    Further information requested
  • 20 Feb 2024
    Further information received
  • 25 Apr 2024
    Decision
    Appeal window closed 23 May 2024

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 53.15039, -6.92538

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    • Radon risk area · 1
      About 1 in 10 homes in this area is likely to have high radon levels

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 131953). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/KildareCC/AppFileRefDetails/2360077/0.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open