Planning Register
Kildare County Council · 2422 · PERMISSION

Site 11 , Kilcullen Business Campus , Kilcullen

Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 19 Jan 2024We first saw it 11 Sept 2026, 18:51 (967 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

2422 is a planning application for permission at Site 11 , Kilcullen Business Campus , Kilcullen, received by Kildare County Council on 19 Jan 2024 and first seen by Planning Register on 11 Sept 2026. The application describes: for construction of a regional distribution warehouse/logistics centre. The proposed main building will have a gross floor area of 3238 sq.m and will have an overall height of 12.8m (from finished floor level to parapet level) with two storey ancillary offices, staff facilities and drivers waiting area located within the main building envelope along with 6 no. loading docks and a level access loading bay located in the warehouse area, internal plant within warehouse, ground level air conditioning units, roof and southern elevation mounted solar panels and back lit elevation signage. Ancillary to the main building a new 6.5m high sprinkler supply storage tank ancillary 3.5m high pumphouse for fire safety is proposed. The proposed development involves the reconfiguration of an existing turning bay with ancillary roadside verge works and road markings, extension of the existing foul sewer and water main public infrastructure, onsite car parking spaces (including disabled spaces and EV spaces) on site cycle parking spaces. The development includes site development and facilitation works including new vehicular entrance, internal drainage infrastructure with connection to existing surface water pipeline, waste and recycling areas, boundary treatments, landscaping, service yards, internal roads, footpaths, lighting, internal gates and fire tender access route. The council granted permission on 9 Dec 2024, with conditions. The five-week observation window closed on 23 Feb 2024. Within 500 m there are 17 other decided applications in the last five years.

Appeal window closes 15 Jan 2025 closed 605 days ago
4 weeks from the council's decision (9 Dec 2024) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

for construction of a regional distribution warehouse/logistics centre. The proposed main building will have a gross floor area of 3238 sq.m and will have an overall height of 12.8m (from finished floor level to parapet level) with two storey ancillary offices, staff facilities and drivers waiting area located within the main building envelope along with 6 no. loading docks and a level access loading bay located in the warehouse area, internal plant within warehouse, ground level air conditioning units, roof and southern elevation mounted solar panels and back lit elevation signage. Ancillary to the main building a new 6.5m high sprinkler supply storage tank ancillary 3.5m high pumphouse for fire safety is proposed. The proposed development involves the reconfiguration of an existing turning bay with ancillary roadside verge works and road markings, extension of the existing foul sewer and water main public infrastructure, onsite car parking spaces (including disabled spaces and EV spaces) on site cycle parking spaces. The development includes site development and facilitation works including new vehicular entrance, internal drainage infrastructure with connection to existing surface water pipeline, waste and recycling areas, boundary treatments, landscaping, service yards, internal roads, footpaths, lighting, internal gates and fire tender access route

Status
APPLICATION FINALISED
Decision
Conditional on 9 Dec 2024
Final grant
28 Jan 2025
Permission expires
27 Jan 2030
Site (from polygon)
1.53 ha
Location precision
site (coords_polygon)

Timeline

  • 19 Jan 2024
    New application
    Observation window closed 23 Feb 2024
  • 11 Mar 2024
    Further information requested
  • 18 Nov 2024
    Further information received
  • 9 Dec 2024
    Decision
    Appeal window closed 15 Jan 2025

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 53.12474, -6.75629

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    • Radon risk area · 1
      About 1 in 10 homes in this area is likely to have high radon levels

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 133878). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/KildareCC/AppFileRefDetails/2422/0.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open