2460265 is a planning application for permission at Halverstown Townland , Kilcullen , Co. Kildare, received by Kildare County Council on 28 Mar 2024 and first seen by Planning Register on 11 Sept 2026. The application describes: for (i) an increase in the total permitted intake of soil and stone and broken rock to the existing licensed soil recovery facility at Halverstown, Kilcullen, Co. Kildare (Planning Ref: 18/453), from 1.2 million tonnes to 2.06 million tonnes and (ii) an extension to the life of the existing facility of 3 years (to December 2029) in order to accommodate the additional soil and stone intake. These works, which are required to implement a revised backfilling and restoration scheme for the former sand and gravel pit will also provide for (i) continued shared use of existing, co-located site facilities, structures and infrastructure (including the site office, staff welfare facilities, weighbridge (with dedicated office), wheelwash, hardstand areas, fuel storage tanks and site access road); (ii) continued soil and stone intake at a rate of up to 300,000 tonnes per annum, of which no more than 95,000 tonnes (per annum) will be managed as waste; (iii) continued separation of any construction and demolition waste (principally concrete, metal, timber, PVC pipework and plastic) inadvertently imported to the facility, prior to removal off-site to authorised waste disposal or recovery facilities; (iv) continued use of a section of the existing concrete block curing shed as a waste inspection and quarantine facility; (v) continued environmental monitoring of noise, dust and groundwater for the duration of the site recovery and restoration activities and for a short period thereafter (and in accordance with current EPA waste licence requirements); (vi) continued temporary stockpiling of topsoil pending its re-use as cover material for final restoration of the site; and (vii) ultimate restoration of the modified final landform to native woodland and grassland habitats. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of this Planning Application. The proposed development requires a waste licence review from the Environmental Protection Agency. The council granted permission on 7 Nov 2024, with conditions. The five-week observation window closed on 2 May 2024. The register records an appeal (ABP-321387-24), decided: modified.
Proposal
for (i) an increase in the total permitted intake of soil and stone and broken rock to the existing licensed soil recovery facility at Halverstown, Kilcullen, Co. Kildare (Planning Ref: 18/453), from 1.2 million tonnes to 2.06 million tonnes and (ii) an extension to the life of the existing facility of 3 years (to December 2029) in order to accommodate the additional soil and stone intake. These works, which are required to implement a revised backfilling and restoration scheme for the former sand and gravel pit will also provide for (i) continued shared use of existing, co-located site facilities, structures and infrastructure (including the site office, staff welfare facilities, weighbridge (with dedicated office), wheelwash, hardstand areas, fuel storage tanks and site access road); (ii) continued soil and stone intake at a rate of up to 300,000 tonnes per annum, of which no more than 95,000 tonnes (per annum) will be managed as waste; (iii) continued separation of any construction and demolition waste (principally concrete, metal, timber, PVC pipework and plastic) inadvertently imported to the facility, prior to removal off-site to authorised waste disposal or recovery facilities; (iv) continued use of a section of the existing concrete block curing shed as a waste inspection and quarantine facility; (v) continued environmental monitoring of noise, dust and groundwater for the duration of the site recovery and restoration activities and for a short period thereafter (and in accordance with current EPA waste licence requirements); (vi) continued temporary stockpiling of topsoil pending its re-use as cover material for final restoration of the site; and (vii) ultimate restoration of the modified final landform to native woodland and grassland habitats. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of this Planning Application. The proposed development requires a waste licence review from the Environmental Protection Agency
- Status
- APPLICATION FINALISED
- Decision
- Conditional on 7 Nov 2024
- Final grant
- 14 Jan 2025
- Site (from polygon)
- 17.68 ha
- Location precision
- site (coords_polygon)
Timeline
- 28 Mar 2024New applicationObservation window closed 2 May 2024
- 21 May 2024Further information requested
- 13 Sept 2024Further information received
- 7 Nov 2024DecisionAppeal window closed 5 Dec 2024
- 4 Dec 2024Appeal lodged

Full planning report for 53.09347, -6.76682
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
The register records appeal ABP-321387-24 (status unknown) but we have not matched the ACP case yet.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
- Radon risk area · 1
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 136004). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/KildareCC/AppFileRefDetails/2460265/0.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |