Maynooth 220kV Substation , Taghadoe , Co. Kildare
Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness
2460400 is a planning application for permission at Maynooth 220kV Substation , Taghadoe , Co. Kildare, received by Kildare County Council on 2 May 2024 and first seen by Planning Register on 11 Sept 2026. The application describes: for construction of infrastructure, and associated development, at the existing and planned expanded substation, comprising:- •construction of a new 220 kV Gas Insulated Switchgear (GIS) building (83.5m long x 18.5m wide (25.1m including staircases), 17m in height) (1,637 sqm); • construction of a new 110kV GIS building (68.8m x 15.4m, (22m including staircases) 15m in height) (1,138sqm); • both of the GIS Buildings will have 8 no. associated air rods on each of the roofs (3m in height); • construction of 4 no. 220/110kV power transformers to include connections to the new GIS buildings; • 2 no. 220kV and 1 no. 110kV line/cable interface towers and associated removal of 3 no. existing end masts; • 3 no. lightning masts (height 22m); • cable connections to the 220kV GIS building; • new 4.5m wide internal access road and 10 no. new permanent car parking spaces; • associated site excavation, infrastructural and site development works, and above and below ground boundary treatment and landscaping including palisade fencing (2.6m height), lighting and surface water drainage and foul water tank; • associated demolition of existing bungalow farmhouse and agricultural buildings (1,111.6m2 floorspace total) to facilitate the proposed development; and • all ancillary and associated temporary works to facilitate the development at the construction stage, including construction access track, temporary construction compound / site laydown areas and cable connection for the existing Derryiron-Maynooth 110kV overhead line. Planning permission is sought for a period of 10 years. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. No decision has been recorded yet. The five-week observation window closed on 6 Jun 2024. Within 500 m there are 10 other decided applications in the last five years.
Proposal
for construction of infrastructure, and associated development, at the existing and planned expanded substation, comprising:- •construction of a new 220 kV Gas Insulated Switchgear (GIS) building (83.5m long x 18.5m wide (25.1m including staircases), 17m in height) (1,637 sqm); • construction of a new 110kV GIS building (68.8m x 15.4m, (22m including staircases) 15m in height) (1,138sqm); • both of the GIS Buildings will have 8 no. associated air rods on each of the roofs (3m in height); • construction of 4 no. 220/110kV power transformers to include connections to the new GIS buildings; • 2 no. 220kV and 1 no. 110kV line/cable interface towers and associated removal of 3 no. existing end masts; • 3 no. lightning masts (height 22m); • cable connections to the 220kV GIS building; • new 4.5m wide internal access road and 10 no. new permanent car parking spaces; • associated site excavation, infrastructural and site development works, and above and below ground boundary treatment and landscaping including palisade fencing (2.6m height), lighting and surface water drainage and foul water tank; • associated demolition of existing bungalow farmhouse and agricultural buildings (1,111.6m2 floorspace total) to facilitate the proposed development; and • all ancillary and associated temporary works to facilitate the development at the construction stage, including construction access track, temporary construction compound / site laydown areas and cable connection for the existing Derryiron-Maynooth 110kV overhead line. Planning permission is sought for a period of 10 years. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
- Status
- INCOMPLETED APPLICATION
- Decision
- N/a
- Site (from polygon)
- 20.46 ha
- Location precision
- site (coords_polygon)
Timeline
- 2 May 2024Decision
- 2 May 2024New applicationObservation window closed 6 Jun 2024

Full planning report for 53.34808, -6.60383
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
- Radon risk area · 2
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 132303). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/KildareCC/AppFileRefDetails/2460400/0.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |