UCD Lyons Farm , Lyons Estate , Celbridge
Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness
2560876 is a planning application for permission at UCD Lyons Farm , Lyons Estate , Celbridge, received by Kildare County Council on 1 Aug 2025 and first seen by Planning Register on 11 Sept 2026. The application describes: for the demolition of 1 no. existing farm shed, 1 no. existing Nutrition Lab building, 2 no. existing silos, an existing plinth, and a bay window on the existing compound, totalling 1,604 sqm GFA; The construction of a 2 no. storey ‘UCD FBD Agricultural Science Centre’, measuring at 2,037 sqm GFA, to include labs, teaching labs, classrooms, and study areas which will connect to the existing AgTech Building which adjoins the subject site. The use of the building is associated with the existing use of the farm as an educational facility; The relocation of 6 no. car parking spaces from the existing car park to maintain a total of 48 no. car parking spaces; The relocation of the existing AC unit enclosure on the subject site to roof level of the new proposed building; The provision of 20 no. bicycle parking spaces to serve the development; The provision of an attenuation pond and percolation area; All associated site development works including landscaping and servicing. The council granted permission on 17 Dec 2025, with conditions. The five-week observation window closed on 5 Sept 2025. Within 500 m there are 3 other decided applications in the last five years.
Proposal
for the demolition of 1 no. existing farm shed, 1 no. existing Nutrition Lab building, 2 no. existing silos, an existing plinth, and a bay window on the existing compound, totalling 1,604 sqm GFA; The construction of a 2 no. storey ‘UCD FBD Agricultural Science Centre’, measuring at 2,037 sqm GFA, to include labs, teaching labs, classrooms, and study areas which will connect to the existing AgTech Building which adjoins the subject site. The use of the building is associated with the existing use of the farm as an educational facility; The relocation of 6 no. car parking spaces from the existing car park to maintain a total of 48 no. car parking spaces; The relocation of the existing AC unit enclosure on the subject site to roof level of the new proposed building; The provision of 20 no. bicycle parking spaces to serve the development; The provision of an attenuation pond and percolation area; All associated site development works including landscaping and servicing
- Status
- APPLICATION FINALISED
- Decision
- Conditional on 17 Dec 2025
- Final grant
- 5 Feb 2026
- Permission expires
- 4 Feb 2031
- Site (from polygon)
- 4,586 m²
- Location precision
- site (coords_polygon)
Timeline
- 1 Aug 2025New applicationObservation window closed 5 Sept 2025
- 22 Sept 2025Further information requested
- 1 Dec 2025Further information received
- 17 Dec 2025DecisionAppeal window closed 23 Jan 2026

Full planning report for 53.29904, -6.53670
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
- Radon risk area · 3
- Recorded monument · 7
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 134601). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/KildareCC/AppFileRefDetails/2560876/0.
Source: npad · fetched 11 Sept 2026, 18:51