Planning Register
Kildare County Council · 2560918 · PERMISSION

Blackwood , Robertstown , Co. Kildare

Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 11 Aug 2025We first saw it 11 Sept 2026, 18:51 (397 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

2560918 is a planning application for permission at Blackwood , Robertstown , Co. Kildare, received by Kildare County Council on 11 Aug 2025 and first seen by Planning Register on 11 Sept 2026. The application describes: for the construction of a two storey rear extension to existing two storey house, construction of a two storey front extension to existing two storey house, removal of two storey gable end front projections to existing house, construction of extended parapet walls and cappings to existing wall plate level to existing house, amendments of existing side fenestrations with new doors and windows at ground and first floor level, nappe plaster band details around all doors and windows, removal of front stone and brick façade with replacement nappe plaster, construction of single storey side extensions to existing two storey house, installation of new secondary effluent treatment system and all associated site works. The council refused permission on 26 Feb 2026. The five-week observation window closed on 15 Sept 2025. The register records an appeal (PL-500983-KE-26), decided: refused. Within 500 m there are 4 other decided applications in the last five years.

Appeal window closes 26 Mar 2026 closed 170 days ago
4 weeks from the council's decision (26 Feb 2026) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

for the construction of a two storey rear extension to existing two storey house, construction of a two storey front extension to existing two storey house, removal of two storey gable end front projections to existing house, construction of extended parapet walls and cappings to existing wall plate level to existing house, amendments of existing side fenestrations with new doors and windows at ground and first floor level, nappe plaster band details around all doors and windows, removal of front stone and brick façade with replacement nappe plaster, construction of single storey side extensions to existing two storey house, installation of new secondary effluent treatment system and all associated site works

Status
APPLICATION FINALISED
Decision
Refused on 26 Feb 2026
Site (from polygon)
4,929 m²
Location precision
site (coords_polygon)

Timeline

  • 11 Aug 2025
    New application
    Observation window closed 15 Sept 2025
  • 2 Oct 2025
    Further information requested
  • 7 Jan 2026
    Further information received
  • 26 Feb 2026
    Decision
    Appeal window closed 26 Mar 2026
  • 16 Mar 2026
    Appeal lodged

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 53.29238, -6.80788

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

The register records appeal PL-500983-KE-26 (status unknown) but we have not matched the ACP case yet.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    • Radon risk area · 1
      About 1 in 10 homes in this area is likely to have high radon levels

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 134764). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/KildareCC/AppFileRefDetails/2560918/0.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open