2660343 is a planning application for permission at Newtown , Ballycullane Lower and Ballycullane Upper , Co. Kildare, received by Kildare County Council on 31 Mar 2026 and first seen by Planning Register on 11 Sept 2026. The application describes: RED III Application for a solar farm development that will consist of: (i) Construction and operation solar PV panels on ground mounted steel supported structures with associated string inverters; (ii) Installation of 18 no. transformer stations at various points across the site; (iii) Internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical inverters/transformers; (iv) Provision of 1 no. site entrance from the L4014 via an existing agricultural access point and provision of 1 no. passing bay along the L4014; (v) Provision of internal access tracks and watercourse/drain crossings, perimeter fencing and pole mounted CCTV cameras; (vi) 1 no. temporary construction compound; (vii) All associated site development, landscaping, drainage arrangements and ancillary works. The proposed solar farm development spans a total site area measuring c. 126.4ha, of which c. 65.1ha, the subject of this application, is located in Co. Kildare and c. 61.3ha is located in Co. Carlow. A separate planning application is being lodged with Carlow County Council. Permission is sought for a period of 10 years with an operational period of 40 years. The total capacity of solar PV panels of the entire development including Carlow and Kildare is estimated to be c. 120MW. A Natura Impact Statement (NIS) has been prepared and was submitted as part of this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. No decision has been recorded yet.

No statutory window is open on this application.
We have no receipt date to compute an observation deadline from.

Proposal

RED III Application for a solar farm development that will consist of: (i) Construction and operation solar PV panels on ground mounted steel supported structures with associated string inverters; (ii) Installation of 18 no. transformer stations at various points across the site; (iii) Internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical inverters/transformers; (iv) Provision of 1 no. site entrance from the L4014 via an existing agricultural access point and provision of 1 no. passing bay along the L4014; (v) Provision of internal access tracks and watercourse/drain crossings, perimeter fencing and pole mounted CCTV cameras; (vi) 1 no. temporary construction compound; (vii) All associated site development, landscaping, drainage arrangements and ancillary works. The proposed solar farm development spans a total site area measuring c. 126.4ha, of which c. 65.1ha, the subject of this application, is located in Co. Kildare and c. 61.3ha is located in Co. Carlow. A separate planning application is being lodged with Carlow County Council. Permission is sought for a period of 10 years with an operational period of 40 years. The total capacity of solar PV panels of the entire development including Carlow and Kildare is estimated to be c. 120MW. A Natura Impact Statement (NIS) has been prepared and was submitted as part of this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Status
INCOMPLETED APPLICATION
Decision
N/a
Site (from polygon)
128.85 ha
Location precision
site (coords_polygon)

Timeline

  • 31 Mar 2026
    Decision

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 52.87023, -6.78309

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    • Radon risk area · 1
      About 1 in 10 homes in this area is likely to have high radon levels

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 62313). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/KildareCC/AppFileRefDetails/2660343/0.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open