PlanningRegister.ie
Kilkenny County Council · 21522

Kilkenny Castle, The Parade, Kilkenny

Approved in Sept 2021. The approval ran out in 2026.

  1. 15 Jun 2021Received
  2. 6 Aug 2021Conditional
  3. 8 Sept 2021Final approval
  4. 7 Sept 2026Approval ran out
Status
Approved
Decision
Conditional · 6 Aug 2021
Council
Kilkenny County Council
Type
PERMISSION
Site
1.93 ha

Live near Kilkenny Castle?

Everything else planned on your street, in one report.

Check my street
Council register ↗

What’s proposed

for development works to improve universal access to the castle and grounds to consist of the following: 1.The Installation of a Universally Accessible Lift to the north turret of the mid-19th Century Long Gallery with associated works,including part demolition of late 20th Century intermediate floor (12m2) and late 20th Century flat roof (11m2) and construction of a new,lead-clad, roof structure. 2.The construction of external steps and ramps adjacent to the north turret to provide access to the basement level. 3.The removal of late 20th Century steps(6m2) and partial removal of 20th Century Plant room(5.5m2) and 19thCentury store (33m2) to facilitate new universal access. 4.The provision of Universally Accessible W.C.& additional W.C. facilities (45m2) in the existing 19th Century basement, semi-vaulted area, external to the castle. 5.Re-landscaping works to the Castle Courtyard and curtilage, involving the permanent display of the recent archaeological excavations of Marshal's Gate (medieval entrance) which is to be partially uncovered with the formation of new embankments, a new pedestrian route and associated treatment. 6.Resurfacing works to the Castle Courtyard, including the removal of 20th Century grassed areas and replacement of existing tarmacadam surface with a new surface(2692m2). 7.Rationalisation of futureproofing of services within the courtyard, to include the installation of new drainage. 8.Conservaton and restoration of Kilkenny Limestone pavement and earthenware channels to the perimeter of the Courtyard. 9.Resurfacing works to the Formal Garden to the northwest of the Castle with the replacement of the existing tarmacadam surface treatment with a new surface(2238m2). 10.New sloped paths to provide Universal Access to the perimeter of the Formal Garden (22m2). 11.Resurfacing works to the linking path between the Formal Garden and Castle Courtyard with the replacement of the existing tarmacadam surface treatment with a new surface (872m2). 12.The replacement of existing temporary security cameras with permanent cameras and fixtures. 13.The Installation of Emergency Lighting at high level to the Castle Courtyard Facades

Planning details

Reference
21522
Local authority
Kilkenny County Council
Status
Granted with conditions · register status “APPLICATION FINALISED”
Received
15 Jun 2021
Observations close
20 Jul 2021 (closed 1920 days ago)
Decision due
9 Aug 2021 · decided 6 Aug 2021
Decision
Conditional on 6 Aug 2021
Site area
1.93 ha from the mapped boundary, not the council's figure

Nearby 130 · 500 m · 5 years

Show all 130

Explore this area on the map →

Homes nearby

Zoning

G5 — Open space and amenity

Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.

M2 — Major town centre

The main town centre — retail, offices, civic uses, apartments.

S5 — Sustainable neighbourhood infrastructure

Reserved for the schools, creches, community and health facilities a neighbourhood needs.

Protections nearby 250 m

  • NIAH-recorded building · 211
    house; Scotch House
  • Recorded monument · 178
    House - 16th/17th century; Almshouse

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

21522 is a planning application to Kilkenny County Council for for development works to improve universal access to the castle and grounds to consist, received on 15 Jun 2021; permission was granted with conditions on 6 Aug 2021.