Ballyconra Parksgrove and Moatpark, Ballyragget, Co. Kilkenny
- 21 Jul 2023Received
- 29 Feb 2024Conditional
- 2 Apr 2024Final grant
- 11 Aug 2032Permission expires
- Status
- Granted with conditions
- Decision
- Conditional · 29 Feb 2024
- Council
- Kilkenny County Council
- Type
- PERMISSION
- Site
- 60.42 ha
What’s proposed
for the Proposed installation of a network connection and grid connection, and minor amendments to solar farms previously approved under planning application references 17/669 and 22/126. The proposed development will consist of the installation of a 33kV network connection between the solar farms approved under planning application references 17/669 and 22/126 comprising: c. 921m of overhead line and 9 No. wooden poles; onward connection of said approved solar farms to Ballyragget 38kV Substation by installation of a 38kV cable comprising c. 786m of underground cable and c. 395m of overhead line on 5 No. wooden poles; amendments to solar farm approved under planning reference 17/669 comprising removal of substation and replacement with solar panels; amendments to the layout of the substation approved under planning reference 22/126, and all associated site works
2360330 is a planning application to Kilkenny County Council for for the Proposed installation of a network connection and grid connection, and minor, received on 21 Jul 2023; permission was granted with conditions on 29 Feb 2024.
Planning details
- Reference
- 2360330
- Local authority
- Kilkenny County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 21 Jul 2023
- Observations close
- 25 Aug 2023 (closed 1132 days ago)
- Decision due
- 29 Feb 2024 · decided 29 Feb 2024
- Decision
- Conditional on 29 Feb 2024
- Proposed development
- for the Proposed installation of a network connection and grid connection, and minor amendments to solar farms previously approved under planning application references 17/669 and 22/126. The proposed development will consist of the installation of a 33kV network connection between the solar farms approved under planning application references 17/669 and 22/126 comprising: c. 921m of overhead line and 9 No. wooden poles; onward connection of said approved solar farms to Ballyragget 38kV Substation by installation of a 38kV cable comprising c. 786m of underground cable and c. 395m of overhead line on 5 No. wooden poles; amendments to solar farm approved under planning reference 17/669 comprising removal of substation and replacement with solar panels; amendments to the layout of the substation approved under planning reference 22/126, and all associated site worksAs published by the register.
- Site area
- 60.42 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 3 applications within 500 m in the last 5 years
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
- NIAH-recorded building · 1
- Recorded monument · 30
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 389622). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/KilkennyCC/AppFileRefDetails/2360330/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |