PlanningRegister.ie
Kilkenny County Council · 2560694

Lilac Lodge, Waterford Road, Kilkenny

Approved in Dec 2025.

What’s proposed

To retain and re-align the existing entrance to the property, for re-arrangement of the permitted internal car park to the front of the property, for retention of minor alterations to the existing building of previous permitted works under Planning Ref No 23/60375 and Planning Ref No 2460077 to include for additional floor area (5.7M2) to the escape stair enclosure, for the installation of 2 no. fixed opaque windows…

Show all

to the North Side Elevation of the building, for the removal of the existing dormer roof windows (2 to front, 1 to rear) and to replace with 3 no. Velux roof windows, for alterations to the location of access ramps and steps to the building, for the retention of a canopy at eaves level to the front, side and rear of the building together with all other associated site works

  1. 29 Oct 2025Received
  2. 9 Dec 2025Conditional
  3. 20 Jan 2026Final approval
  4. 12 Nov 2028Approval runs out

An email when the builder tells the council work is starting.

Planning details

Status
Approved
Decision
Conditional · 9 Dec 2025
Reference
2560694
Type
RETENTION
Received
29 Oct 2025
Site
1,661 m²

9 other applications within 500 m in the last year · 1 open for comments

Get the full report

Nearby 9 · 500 m · 12 months

Distance
Time
Show all 9

Explore this area on the map →

Homes nearby

Zoning

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

2560694 is a planning application to Kilkenny County Council for to retain and re-align the existing entrance to the property, for re-arrangement of the, received on 29 Oct 2025; permission was granted with conditions on 9 Dec 2025.