Ballytobin & Ballyhall , Co. Kilkenny
- 1 May 2026Received
- 5 Jun 2026Observations closed
- Status
- Withdrawn or invalid
- Decision
- Not yet
- Council
- Kilkenny County Council
- Type
- PERMISSION
- Site
- 9.09 ha
What’s proposed
for the construction of a Single Wind Turbine development on an 8.96-hectare site consisting of: - I. A single 4.26-megawatt (MW) wind turbine with an overall tip height of 159m, comprising a rotor diameter of 138m and a hub height 90m; II. Wind turbine foundation, crane hardstanding and assembly area; III. Temporary Construction Compound; IV. Upgrade of an existing field entrance to new wind farm site entrance; V. Upgrading and widening of existing access tracks; VI. New access tracks; VII. An on-site 20kV electrical substation, comprising of 2 Modular Substation Buildings; VIII. Electrical and communication cabling within private lands; IX. Tree felling, landscaping and reinstatement works; and X. All associated ancillary works. The operational lifespan of the development will be 35-years from the date of commissioning. This Planning Application is not subject to a Natura Impact Statement (NIS) or Environmental Impact Assessment Report (EIAR)
2660259 is a planning application to Kilkenny County Council for for the construction of a Single Wind Turbine development on an 8.96-hectare site, received on 1 May 2026; the file is recorded as incompleted application.
Planning details
- Reference
- 2660259
- Local authority
- Kilkenny County Council
- Status
- Withdrawn or invalid · register status “INCOMPLETED APPLICATION”
- Received
- 1 May 2026
- Observations close
- 5 Jun 2026 (closed 111 days ago)
- Decision due
- No due date published
- Decision
- Not decided
- Proposed development
- for the construction of a Single Wind Turbine development on an 8.96-hectare site consisting of: - I. A single 4.26-megawatt (MW) wind turbine with an overall tip height of 159m, comprising a rotor diameter of 138m and a hub height 90m; II. Wind turbine foundation, crane hardstanding and assembly area; III. Temporary Construction Compound; IV. Upgrade of an existing field entrance to new wind farm site entrance; V. Upgrading and widening of existing access tracks; VI. New access tracks; VII. An on-site 20kV electrical substation, comprising of 2 Modular Substation Buildings; VIII. Electrical and communication cabling within private lands; IX. Tree felling, landscaping and reinstatement works; and X. All associated ancillary works. The operational lifespan of the development will be 35-years from the date of commissioning. This Planning Application is not subject to a Natura Impact Statement (NIS) or Environmental Impact Assessment Report (EIAR)As published by the register.
- Site area
- 9.09 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 2 applications within 500 m in the last 5 years
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
- Radon risk area · 1
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 389941). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/KilkennyCC/AppFileRefDetails/2660259/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |