PlanningRegister.ie
Laois County Council · 23103

Abbeyleix House, Abbeyleix Demense, Co. Laois

Approved in Jun 2023. Building started in 2024.

  1. 28 Mar 2023Received
  2. 19 May 2023Conditional
  3. 20 Jun 2023Final approval
  4. 9 May 2024Building started

Planning details

Status
Building startedi
Decision
Conditional · 19 May 2023
Reference
23103
Received
28 Mar 2023
Units
1
Site
869 m²

What’s proposed

Develop on this c. 0.09 Ha site which is located within the Abbeyleix Estate (which contains a number of Protected Structures). The subject site is located at Abbeyleix House 'the Main House', located in the central portion of Abbeyleix Estate, in the townland of Abbeyleix Demesne, Co. Laois. Abbeyleix House is a Protected Structure (RPS-090-C).

Show all

The development will consist of: Proposed alterations to the central first floor window (south elevation) to form a door opening, with a 1.1m glazed screen, to provide for use of the Juliet balcony; proposed alterations to the first floor northern end window (east elevation) to form a door opening onto a proposed terrace, utilising flat roof of ground floor annex (study) and including 1.1m high balustrade and planters; the upgrade of 6 no. first floor sash windows to new slim double-glazed window units; and all associated works, including making good works

6 other applications within 500 m in five years

Open the report

Nearby 6 · 500 m · 5 years

Distance
Time

Explore this area on the map →

Homes nearby

Building started

  • 9 May 2024 · Builder told the council small works were starting CN0114835LS

Protections nearby 250 m

  • NIAH-recorded building · 4
    Abbey Leix
Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

23103 is a planning application to Laois County Council for develop on this c. 0.09 Ha site which is located within the Abbeyleix Estate (which, received on 28 Mar 2023; permission was granted with conditions on 19 May 2023.