Kilmullen Ullard or Controversyland Clonanny Lea and Loughmansland Glebe, Portarlington, Co. Laois
Decided on appeal: granted.
- 23 Sept 2025Received
- 30 Dec 2025Refused
- 22 Jul 2036Approval runs out
- Status
- Appeal decided — granted
- Decision
- Refused · 30 Dec 2025
- Council
- Laois County Council
- Type
- PERMISSION
- Site
- 23.09 ha
Live near Kilmullen Ullard or Controversyland…?
Everything else planned on your street, in one report.
Check my streetWhat’s proposed
develop the following within Co. Laois: • Linear arrays of solar PV panels on ground mounted steel supported structures with associated cabling and ducting (including onsite control and switch gear room and underground cable grid connection to the Bracklone 110kV substation); • 2 no. proposed single storey inverter stations; • A co-located Battery Energy Storage System (BESS) park (including 16 no. containers with cells and 4 no. containers with PCS and inverters) with associated security fencing and gates; • Site Perimeter fencing; • 1 no. new site entrance with palisade double security gates; • 1 no. temporary construction compound/carpark/material storage area with associated temporary site offices, parking areas and security fencing; • 1 no. temporary and 1 no. permanent steel storage containers; • Site access tracks including passing and turning bays; • On-site pole mounted CCTV cameras; • 1 no. temporary construction stage Moby Dick type wheel wash systems; • 1 no. Concrete wash out locations (within temporary construction compound); and • All associated and ancillary works The proposed solar farm development spans a total site area measuring 60.36 ha, of which 37.66 ha is located in Co. Kildare and 22.7 ha is located in Co. Laois. Permission is sought for a period of 10 years with an operational period of 40 years. The total capacity of Solar PV on the site is estimated to be 32 MW. An Appropriate Assessment Screening Report (AASR) and Natura Impact Statement (NlS) has been prepared for this development and submitted with this planning application. The development is covered by the provisions of the (RED III) Renewable Energy Directive III (Directive (EU) 2023/2413 ). The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
Planning details
- Reference
- 2560611
- Local authority
- Laois County Council
- Status
- Appeal decided — granted · register status “APPLICATION FINALISED”
- Received
- 23 Sept 2025
- Observations close
- 28 Oct 2025 (closed 346 days ago)
- Decision due
- 1 Jan 2026 · decided 30 Dec 2025
- Decision
- Refused on 30 Dec 2025
- Proposed development
- develop the following within Co. Laois: • Linear arrays of solar PV panels on ground mounted steel supported structures with associated cabling and ducting (including onsite control and switch gear room and underground cable grid connection to the Bracklone 110kV substation); • 2 no. proposed single storey inverter stations; • A co-located Battery Energy Storage System (BESS) park (including 16 no. containers with cells and 4 no. containers with PCS and inverters) with associated security fencing and gates; • Site Perimeter fencing; • 1 no. new site entrance with palisade double security gates; • 1 no. temporary construction compound/carpark/material storage area with associated temporary site offices, parking areas and security fencing; • 1 no. temporary and 1 no. permanent steel storage containers; • Site access tracks including passing and turning bays; • On-site pole mounted CCTV cameras; • 1 no. temporary construction stage Moby Dick type wheel wash systems; • 1 no. Concrete wash out locations (within temporary construction compound); and • All associated and ancillary works The proposed solar farm development spans a total site area measuring 60.36 ha, of which 37.66 ha is located in Co. Kildare and 22.7 ha is located in Co. Laois. Permission is sought for a period of 10 years with an operational period of 40 years. The total capacity of Solar PV on the site is estimated to be 32 MW. An Appropriate Assessment Screening Report (AASR) and Natura Impact Statement (NlS) has been prepared for this development and submitted with this planning application. The development is covered by the provisions of the (RED III) Renewable Energy Directive III (Directive (EU) 2023/2413 ). The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall applyAs published by the register.
- Site area
- 23.09 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 11 · 500 m · 5 years
- OpenLoughmanlands Glebe , Portarlington , Co. Laois
- CommencedLoughmansland Glebe , Portarlington , Co. Laois
- WithdrawnLoughmansland Glebe , Portarlington , Co. Laois
- WithdrawnLea/Clonanny , Portarlington , Co. Laois
- GrantedClonanny , Portarlington , Laois
- WithdrawnKilmullen , Portarlington , Co. Laois
- GrantedLoughmanlands Glebe , Portarlington , Co. Laois
- GrantedLoughmansland Glebe , Portarlington , Co. Laois
Show all 11
Homes nearby
Appeal
Appeal PL-500706-LS-26 (status unknown), not yet matched.
Zoning
Zoned for waterfront and harbour-related development.
Tied to the efficient operation and development of the airport under its own plan — which also means aircraft noise contours apply.
Protections nearby 250 m
No mapped flood area nearby.
- NIAH-recorded building · 2
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |
Summary
2560611 is a planning application to Laois County Council for develop the following within Co. Laois: • Linear arrays of solar PV panels on ground, received on 23 Sept 2025; permission was refused on 30 Dec 2025.