Knockfeerina, Kilmacow Td, Ballingarry Co. Limerick
Approved in Feb 2018. The approval ran out in 2023.
- 21 Dec 2017Received
- 23 Feb 2018Conditional
- 24 Oct 2023Approval ran out
- Status
- Appeal decided — granted
- Decision
- Conditional · 23 Feb 2018
- Council
- Limerick City and County Council
- Type
- PERMISSION
- Site
- 227 m²
What’s proposed
replacing an in-situ 37.5m structure carrying telecommunications equipment with a 40m multi user structure of similar design, the in-situ equipment will be transferred to the new structure together with the additional equipment proposed and the obsolete structure will be removed post construction. Provision has also been made for additional telecommunications exchange cabinets as required. Retention permission is sought for 2 no. telecommunications exchange cabins and 2.4m chain link compound with access off an existing track. The location is proximate to National Monument Service Record LI030-080
Planning details
- Reference
- 171230
- Local authority
- Limerick City and County Council
- Status
- Appeal decided — granted · register status “APPLICATION FINALISED”
- Received
- 21 Dec 2017
- Observations close
- 5 Feb 2018 (closed 3172 days ago)
- Decision due
- 23 Feb 2018 · decided 23 Feb 2018
- Decision
- Conditional on 23 Feb 2018
- Site area
- 227 m² from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby none · 500 m · 5 years
No other application within 500 m in the last 5 years.
Appeal
Appeal 301215-18 (status unknown), not yet matched.
Zoning
Not zoned in the current plan.
Protections nearby 250 m
No mapped flood area nearby.
- Recorded monument · 2
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |
Summary
171230 is a planning application to Limerick City and County Council for replacing an in-situ 37.5m structure carrying telecommunications equipment with a 40m, received on 21 Dec 2017; permission was granted with conditions on 23 Feb 2018.