Castle Comfort House, Farnane, Murroe Co. Limerick
Approved in Apr 2021. Building started in 2022.
- 6 Nov 2020Received
- 26 Mar 2021Conditional
- 29 Apr 2021Final approval
- 16 Mar 2022Building started
- Status
- Building startedi
- Decision
- Conditional · 26 Mar 2021
- Council
- Limerick City and County Council
- Type
- PERMISSION
- Site
- 1.67 ha
Live near Castle Comfort House?
Everything else planned on your street, in one report.
Check my streetWhat’s proposed
the demolition of a later mass concrete outbuilding to the North west of the dwelling house and its replacement with a single storey building containing 2 no. bedrooms, a small study and bathroom, linked to the main house via a single storey glazed garden room, minor amendments to the internal layout of the main house to provide an en-suite and walk in wardrobe at first floor level. No other changes are proposed. Castle Comfort House is a recorded Protected Structure (P.P.S. 83)
Planning details
- Reference
- 201140
- Local authority
- Limerick City and County Council
- Status
- Commenced · register status “APPLICATION FINALISED”
- Received
- 6 Nov 2020
- Observations close
- 11 Dec 2020 (closed 2137 days ago)
- Decision due
- 28 Mar 2021 · decided 26 Mar 2021
- Decision
- Conditional on 26 Mar 2021
- Site area
- 1.67 ha from the mapped boundary, not the council's figure
Nearby 1 · 500 m · 5 years
Homes nearby
Building started
- 16 Mar 2022 · Builder told the council work was starting (opted out of the finish sign-off) CN0087057LL
Protections nearby 250 m
- NIAH-recorded building · 1
- Recorded monument · 6
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
201140 is a planning application to Limerick City and County Council for the demolition of a later mass concrete outbuilding to the North west of the dwelling, received on 6 Nov 2020; permission was granted with conditions on 26 Mar 2021.