PlanningRegister.ie
Limerick City and County Council · 22313667

Ballyvalode, Near Oola, Co. Limerick

Approved in Jul 2023. No sign of building yet.

Start notices are matched from the national building control register; a start on site can be missed.

  1. 27 May 2022Received
  2. 6 Jul 2023Conditional
  3. 6 Jul 2033Approval runs out

An email when the builder tells the council work is starting.

Planning details

Status
Approved
Decision
Conditional · 6 Jul 2023
Reference
22313667
Received
27 May 2022
Site
5.40 ha

What’s proposed

A 10-year permission for the construction of a 110kV ‘Loop In-Loop Out’ (LILO) substation and associated works on a site of approximately 6.20 hectares. This will include the following: A substation occupying 2.11 hectares, comprising: TSO (Eirgrid) compound with electrical equipment, transformer sub-compound, bus bars sub-compound, cable chairs and substation building (435m2), enclosed by palisade fencing at 0.95…

Show all

hectares in area. One transformer up to 110kV within the TSO compound and the provision of an area for a second transformer if future Eirgrid expansion is required. Required TSO expansion area enclosed by palisade fencing at 0.79 hectares. Operators compound (with switchroom building, electrical equipment, rainwater collection system) enclosed by palisade fencing at 0.17 hectares. The proposed operators control building will have a gross floor area of approximately 220m2. Perimeter protection area at 0.20 hectares. 7 No. lightning masts to a height of approximately 18m. 1 No. telecoms pole to a height of approximately 20m. Additional space for the possible future requirements for a Harmonics Filter. New entrance to the R507 regional road shared with the proposed solar farm. 5m access road corridor (approx. 1,160m long), and underground cabling route to the substation occupying an area of 3.24ha. Underground cable corridor of approximately 320m in length and provision of 2 no. 16m high mast structures linking proposed substation to adjacent existing overhead 110kV transmission line. Associated construction works and drainage…

Cut short by the council feed. Full text ↗

1 other application within 500 m in the last year

Open the report

Nearby 1 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Homes nearby

Protections nearby 250 m

  • Recorded monument · 1
    R136135
Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

22313667 is a planning application to Limerick City and County Council for a 10-year permission for the construction of a 110kV ‘Loop In-Loop Out’ (LILO), received on 27 May 2022; permission was granted with conditions on 6 Jul 2023.