Approved in Sept 2024. Built and signed off.

  1. 11 Jun 2024Received
  2. 31 Jul 2024Conditional
  3. 3 Sept 2024Final approval
  4. 15 Sept 2025Building started
  5. 30 Jun 2026Signed off
Status
Building started
Decision
Conditional · 31 Jul 2024
Council
Limerick City and County Council
Type
PERMISSION
Site
3,551 m²

Live near Shannon Mall?

Everything else planned on your street, in one report.

Check my street
Council register ↗

What’s proposed

internal alterations to amalgamate the former Tesco retail unit [GIA 1,070.6 sq.m] into the adjoining existing Penney's retail unit, which is located to the northwest of the ‘Shannon Mall’. The proposed development includes; the removal of the existing partition wall between the former Tesco retail unit and existing Penney's retail unit, the removal of internal partitions to existing Penney's retail unit for the provision of a new internal partition through both the existing and amalgamated Penney's retail areas to accommodate a new ancillary office, administration and staff rooms; works to the existing roof structure of the former Tesco retail unit to remove asbestos sheeting and replace this with new profiled metal deck and insulation to match the existing Penney's roof structure. Permission for the removal of 2 no. existing former Tesco shopfront entrances within the Shannon Mall for replacement with new frameless glazing to match the existing Penney's shopfront, removal of existing externally mounted former Tesco signage to the northwest elevation of the Crescent Shopping Centre, installation of a new externally mounted metal cage to accommodate an air conditioning unit on the northwest elevation of the Crescent Shopping Centre to serve Penney's unit, along with the provision of 2 no. externally mounted ventilation louvres to the northwest elevation of the Crescent Shopping Centre to serve Penney's unit, removal of an existing loading dock to the northeast elevation of the Crescent Shopping Centre, removal of existing emergency exit door and external staircase to the northeast elevation of Crescent Shopping Centre, construction of new emergency exit doors and external staircase on the northeast elevation of Crescent Shopping Centre to serve Penney's unit and all associated site development and enabling works

Planning details

Reference
2460574
Local authority
Limerick City and County Council
Status
Commenced · register status “APPLICATION FINALISED”
Received
11 Jun 2024
Observations close
16 Jul 2024 (closed 822 days ago)
Decision due
5 Aug 2024 · decided 31 Jul 2024
Decision
Conditional on 31 Jul 2024
Site area
3,551 m² from the mapped boundary, not the council's figure

Nearby 32 · 500 m · 5 years

Show all 32

Explore this area on the map →

Homes nearby

Building started

  • 15 Sept 2025 · Builder told the council work was starting CN0133067LL

Zoning

M3 — Neighbourhood centre

A local centre: shops, services and apartments over them, serving the surrounding housing.

Protections nearby 250 m

  • Recorded monument · 3
    Bridge; Riverine revetment

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

2460574 is a planning application to Limerick City and County Council for internal alterations to amalgamate the former Tesco retail unit [GIA 1,070.6 sq.m] into, received on 11 Jun 2024; permission was granted with conditions on 31 Jul 2024.