PlanningRegister.ie
Limerick City and County Council · 2561342

Raheen Business Park, Raheen, Limerick

Declared invalid.

  1. 17 Dec 2025Received
  2. 30 Jan 2026Observations closed
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Withdrawn or invalid
Decision
Not yet
Council
Limerick City and County Council
Type
PERMISSION
Site
3.81 ha

Live near Raheen Business Park?

Everything else planned on your street, in one report.

Check my street
Council register ↗

What’s proposed

the installation of a ground mounted solar photovoltaic plant with an approximate capacity of 2.99 MWp and a grid connection capacity of 2.6 MWac within a 3.77 hectare site, including the installation and the cable route to the point of connection at Raheen Business Park, Raheen, Limerick. The proposed development will include approximately 5,800 photo-voltaic modules, covering an approximate area of 18,018.70 square metres, installed on a fixed East West mounting structure with an approximate height of 0.8 metres at the lower edge and 3.1 metres at the highest point. The development will also comprise underground direct current and alternating current cabling, including a cable route located beneath the existing internal cycle path within Raheen Business Park, string combiner boxes, inverters, a prefabricated low voltage transformer cabin located within the photovoltaic installation area, earthing and grid synchronisation equipment, perimeter security fencing with wildlife access points, CCTV where required, drainage and all associated civil works. The development will also include a temporary construction compound and set down area, together with the installation of a mobile welfare unit during the construction phase. The grid connection will be made via the existing on site substation within Raheen Business Park. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Planning details

Reference
2561342
Local authority
Limerick City and County Council
Status
Withdrawn or invalid · register status “INCOMPLETED APPLICATION”
Received
17 Dec 2025
Observations close
30 Jan 2026 (closed 256 days ago)
Decision due
No due date published
Decision
Not decided
Proposed development
the installation of a ground mounted solar photovoltaic plant with an approximate capacity of 2.99 MWp and a grid connection capacity of 2.6 MWac within a 3.77 hectare site, including the installation and the cable route to the point of connection at Raheen Business Park, Raheen, Limerick. The proposed development will include approximately 5,800 photo-voltaic modules, covering an approximate area of 18,018.70 square metres, installed on a fixed East West mounting structure with an approximate height of 0.8 metres at the lower edge and 3.1 metres at the highest point. The development will also comprise underground direct current and alternating current cabling, including a cable route located beneath the existing internal cycle path within Raheen Business Park, string combiner boxes, inverters, a prefabricated low voltage transformer cabin located within the photovoltaic installation area, earthing and grid synchronisation equipment, perimeter security fencing with wildlife access points, CCTV where required, drainage and all associated civil works. The development will also include a temporary construction compound and set down area, together with the installation of a mobile welfare unit during the construction phase. The grid connection will be made via the existing on site substation within Raheen Business Park. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
As published by the register.
Site area
3.81 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby 22 · 500 m · 5 years

Show all 22

Explore this area on the map →

Homes nearby

Zoning

C6 — Waterfront

Zoned for waterfront and harbour-related development.

Protections nearby 250 m

No mapped flood area nearby.

  • NIAH-recorded building · 1
    Roche Castle
  • Recorded monument · 11
    Road - road/trackway; Bridge

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: npad · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
npadCC-BY-4.018 Sept 2026, 15:44open
Summary

2561342 is a planning application to Limerick City and County Council for the installation of a ground mounted solar photovoltaic plant with an approximate, received on 17 Dec 2025; the file is recorded as incompleted application.