PlanningRegister.ie
Limerick City and County Council · 2660943

Ballygoghlan, Glin, Co. Limerick

Decision due 19 Nov.

  1. 14 Aug 2026Received
  2. 18 Sept 2026Observations closed
  3. 19 Nov 2026Decision due

An email when it’s decided. After that, only if it’s appealed or building starts.

Planning details

Status
With the council, no decision yet
Decision
Due 19 Nov 2026
Reference
2660943
Received
14 Aug 2026
Site
82.28 ha

What’s proposed

A renewable energy development as defined by The European Union (Planning and Development) (Renewable Energy) Regulations 2025. The Proposed Development, subject of this application, will consist of: The development and operation of a solar photovoltaic (PV) farm with a total area of 245.33 ha, 70.01 ha of which lies within Co. Limerick.

Show all

The application seeks a 10-year permission with an operational lifetime of 40 years and comprises the following – i. Construction and operation of up to 219,706.1sqm of solar PV arrays on ground-mounted metal frames, with a maximum overall height of up to 2.79 metres. ii. Internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor / transformer skid units. iii. Up to 8 no. electrical inverter / transformer skid units. iv. Construction and operational access to the site by 3 no. site entrances using existing field access points. v. 2 no. temporary construction compounds and ancillary facilities for the duration of the construction phase of the project. vi. Customer substation compound consisting of a single storey substation customer building with welfare facilities (217 sqm), all associated electrical plant and apparatus, underground cabling, lighting columns, parking, storage, fencing, wastewater holding tank and rainwater harvesting tank. vii. 33kV collector cable network, joint bays and associated works. viii. Internal access tracks, site landscaping and drainage works, security fencing, CCTV and all associated ancillary site development works. ix. The decommissioning and reinstatement of the solar farm at the end of its operational life. The elements of the Proposed Project located in Co. Limerick, as described above in i – ix, are the subject of this planning application. The remaining elements, including the construction of up to 541,306.68 sqm of solar PV arrays on ground-mounted metal frames, with a maximum overall height of up to 2.79 metres, internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor / transformer skid units, up to 19 no. electrical / inverter transformer skid units, construction and operational access to the site by 6 no. site entrances, using 4 no. existing field access points and 2 no. new access points, 3 no. temporary construction compounds and ancillary facilities for the duration of the construction phase of the project, 33kV collector cable network, joint…

Cut short by the council feed. Full text ↗

2 other applications within 500 m in the last year

Open the free report

Nearby 2 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Protections nearby 250 m

  • NIAH-recorded building · 1
    Ballygoghlan National School
  • Recorded monument · 8
    Ringfort - rath; R118473
Where this comes from

National planning feed (NPAD), fetched 11 Nov 2026, 23:00.

Source: National Planning Application Database · fetched 11 Nov 2026, 23:00
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Nov 2026, 23:00open
Summary

2660943 is a planning application to Limerick City and County Council for a renewable energy development as defined by The European Union (Planning and, received on 14 Aug 2026; a decision is due by 19 Nov 2026.