Longford Forest, Newcastle Road, Newcastle
Approved in Sept 2022. Building started in 2025; part signed off as finished in Apr 2026.
A newer start notice was filed in Nov 2026: a sign-off can cover one phase of the work.
- 5 Aug 2022Received
- 27 Sept 2022Conditional
- 6 May 2025Building started
- 17 Apr 2026Signed off
Planning details
- Status
- Building started
- Decision
- Conditional · 27 Sept 2022
- Reference
- 22189
- Received
- 5 Aug 2022
- Site
- 162.29 ha
What’s proposed
Extension to the existing development within the existing 160 hectare Centre Parcs Longford Forest Holiday Village. The development will consist of: I) 198 no. new lodges located in 3 no. zones (comprising of 56 no. 2 bedroom lodges, 105 no. 3 bedroom lodges, 32 no. 4 bedroom lodges, 1 no. 5 bedroom lodge, 4 no. 6 bedroom lodges), ii) External sauna/Pods associated with specific lodges (151m2), iii) coffee shop…
Show all
(282m2), iv) lakeside restaurant (902m2), v) energy centre (235m2), vi) staff welfare and storage building (611m2), vii) 2 no. remote housekeeping stores (35m2 each), viii) extensions and alterations to existing commercial retail and leisure buildings, including: a) extension to housekeeping/technical services (HKTS) building (157m2) to provide increased storage, b) extension to existing Aqua Sauna spa facility (453m2) to include new treatment rooms and treetop sauna, c) extension to existing Sub-Tropical Swimming Paradise (STSP) including a new pool (875m2), d) extension to existing Sports Hall (735m2), ix) extensions to existing Village Centre restaurants: a) Huck's restaurant (128m2), b) Cara's restaurant (105m2), c) Sports Café restaurant (104m2) and d) Bella Italia restaurant (222m2 - internal extension only), x) installation of Solar PV on the roof of the existing Sports Hall and Sports Café building and on the roof of the proposed Sports Hall extension, xi) installation of District Heating System within the site, xii) upgrades to existing Wastewater Treatment Plant and associated infrastructure, xiii) new car park to provide 313 no. car parking spaces for staff, xiv) provision of electrical vehicle charging points, xv) provision of new cycle parking within the site, xvi) associated civil infrastructure works including all internal roads, hardstanding and all foul and surface water drainage works, xvii) creation of landscape screening bunds, xviii) erection of security perimeter fencing, xix) all new landscaping and hard landscaping, xx) all ancillary and associated site works
3 other applications within 500 m in the last year
Open the reportNearby 3 · 500 m · 12 months
Homes nearby
Appeal
Appeal ABP-314886-22 (status unknown), not yet matched.
Building started
- 2 Nov 2026 · Builder told the council work was starting CN0149383LD
- 20 Apr 2026 · Builder told the council work was starting CN0140889LD
- 2 Jun 2025 · Builder told the council work was starting CN0129094LD
- 2 Jun 2025 · Builder told the council small works were starting CN0129116LD
- 6 May 2025 · Builder told the council work was starting CN0127895LD
Protections nearby 250 m
- NIAH-recorded building · 5
- Recorded monument · 15
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
22189 is a planning application to Longford County Council for extension to the existing development within the existing 160 hectare Centre Parcs, received on 5 Aug 2022; permission was granted with conditions on 27 Sept 2022.