Molly, Aughnacliffe, Co. Longford
Approved in Aug 2026.
- 26 May 2026Received
- 15 Jul 2026Conditional
- 17 Aug 2026Final approval
- 16 Aug 2031Approval runs out
Planning details
- Status
- Approved
- Decision
- Conditional · 15 Jul 2026
- Reference
- 2660169
- Received
- 26 May 2026
- Site
- 7,652 m²
What’s proposed
The End of Waste activities within the footprint of the existing site, where same activities include: 1) Acceptance, processing and recovery of in-coming inert waste material arising from construction and demolition activity, comprising concrete, bricks, soil or other such similar material, to become a certified product for reuse in construction related industries; 2) The maximum annual intake of incoming waste…
Show all
material shall not exceed of 24,500 tonnes; 3) The processing will include standard crushing and screening using the existing quarry plant; The site infrastructure for the proposed End of Waste activities will be limited to bays comprising storage and processing; 4) AII ancillary site development works. The proposed development seeking planning permission will require a 'Waste Facility Permit' for the acceptance and processing of the in-coming waste, which will be sought through a separate application to Longford County Council. The proposed development seeking planning permission will require registration with Environmental Protection Agency for End of Waste recovery under the National End-of Waste Decision EoW-N00l/2023…
Cut short by the council feed. Full text ↗
1 other application within 500 m in five years
Open the reportNearby 1 · 500 m · 5 years
Homes nearby
Protections nearby 250 m
- NIAH-recorded building · 1
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
2660169 is a planning application to Longford County Council for the End of Waste activities within the footprint of the existing site, where same, received on 26 May 2026; permission was granted with conditions on 15 Jul 2026.