Between N59 &Trawaughter Sand , Mulranny , Co Mayo
- 23 Dec 2019Received
- 13 Apr 2021Refused
- 4 Nov 2026Permission expires
- Status
- Appeal decided — other
- Decision
- Refused · 13 Apr 2021
- Council
- Mayo County Council
- Type
- PERMISSION
- Site
- 1.82 ha
What’s proposed
The development will consist of (i) construction of a three bedroom, three storey house(with two storeys below road level) together with new vehicular entrance off the public road and an artist's studio attached, and (ii) construction of an art centre with gallery and artist's studio, and restoration and conversion of the former pump house (which was attached to the former Great Western Railway Hotel) to café, replacement of the existing steps down to the Causeway in order to comply with Part 8 of the Building Regulations and construction of a loading bay adjacent to a new pavement with a new pedestrian entrance leading to a raised timber walkway incorporating a ramp down to the Causeway to provide universal access and to comply with Part M of the Building Regulations
191028 is a planning application to Mayo County Council for the development will consist of (i) construction of a three bedroom, three storey, received on 23 Dec 2019; permission was refused on 13 Apr 2021.
Planning details
- Reference
- 191028
- Local authority
- Mayo County Council
- Status
- Appeal decided — other · register status “APPLICATION FINALISED”
- Received
- 23 Dec 2019
- Observations close
- 5 Feb 2020 (closed 2417 days ago)
- Decision due
- 14 Apr 2021 · decided 13 Apr 2021
- Decision
- Refused on 13 Apr 2021
- Proposed development
- The development will consist of (i) construction of a three bedroom, three storey house(with two storeys below road level) together with new vehicular entrance off the public road and an artist's studio attached, and (ii) construction of an art centre with gallery and artist's studio, and restoration and conversion of the former pump house (which was attached to the former Great Western Railway Hotel) to café, replacement of the existing steps down to the Causeway in order to comply with Part 8 of the Building Regulations and construction of a loading bay adjacent to a new pavement with a new pedestrian entrance leading to a raised timber walkway incorporating a ramp down to the Causeway to provide universal access and to comply with Part M of the Building RegulationsAs published by the register.
- Site area
- 1.82 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Full planning report for 53.90529, -9.78302
Zoning, appeals, sold prices, flood and heritage — the whole area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
The register records appeal ABP-310218-21 (status unknown) but we have not matched the ACP case yet.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 429037). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/MayoCC/AppFileRefDetails/191028/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |