PlanningRegister.ie
Mayo County Council · 19457

SHESKIN , BELLACORICK , CO. MAYO

  1. 12 Jun 2019Received
  2. 6 Nov 2019Conditional
  3. 28 Jan 2020Final grant
  4. 6 Dec 2026Permission expires
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Granted with conditions
Decision
Conditional · 6 Nov 2019
Council
Mayo County Council
Type
PERMISSION
Site
99 m²

What’s proposed

AMENDMENTS TO EXISTING PLANNING PERMISSION P15/825 FOR 8 TURBINES WITH AN OVERALL MAX HEIGHT OF 150M, AMENDMENTS TO INCLUDE - AN INCREASE IN THE OVERALL MAXIMUM HEIGHT OF THE TURBINES FROM 150M TO 176M (TURBINES 1-3) AND FROM 150M TO 165M (TURBINES 4-8) COMPRISING A TOWER 95-120M HIGH TO WHICH THREE BLADES OF 55-70M LENGTH WILL BE ATTACHED. AN INCREASE IN THE MAXIMUM HEIGHT OF THE PERMANENT MET MAST FROM 100M TO 120M. AN INCREASE IN THE DIAMETER OF THE FOUNDATION BASE FROM 22M TO 26M. AN AMENDMENT TO CONDITION NO 46 TO REVISE THE COMMUNITY BENEFIT PAYMENT TO 2 EURO//MWH TO BE CONSISTENT WITH GOVERNMENT GUIDANCE SET OUT UNDER THE RENEWABLE ELECTRICITY SUPPORT SCHEME. THE RED LINE BOUNDARY AND ALL OTHER ASPECTS OF THE PERMITTED DEVELOPMENT WILL REMAIN UNCHANGED

19457 is a planning application to Mayo County Council for aMENDMENTS TO EXISTING PLANNING PERMISSION P15/825 FOR 8 TURBINES WITH AN OVERALL MAX, received on 12 Jun 2019; permission was granted with conditions on 6 Nov 2019.

Planning details

Reference
19457
Local authority
Mayo County Council
Status
Granted with conditions · register status “APPLICATION FINALISED
Received
12 Jun 2019
Observations close
17 Jul 2019 (closed 2620 days ago)
Decision due
11 Nov 2019 · decided 6 Nov 2019
Decision
Conditional on 6 Nov 2019
Proposed development
AMENDMENTS TO EXISTING PLANNING PERMISSION P15/825 FOR 8 TURBINES WITH AN OVERALL MAX HEIGHT OF 150M, AMENDMENTS TO INCLUDE - AN INCREASE IN THE OVERALL MAXIMUM HEIGHT OF THE TURBINES FROM 150M TO 176M (TURBINES 1-3) AND FROM 150M TO 165M (TURBINES 4-8) COMPRISING A TOWER 95-120M HIGH TO WHICH THREE BLADES OF 55-70M LENGTH WILL BE ATTACHED. AN INCREASE IN THE MAXIMUM HEIGHT OF THE PERMANENT MET MAST FROM 100M TO 120M. AN INCREASE IN THE DIAMETER OF THE FOUNDATION BASE FROM 22M TO 26M. AN AMENDMENT TO CONDITION NO 46 TO REVISE THE COMMUNITY BENEFIT PAYMENT TO 2 EURO//MWH TO BE CONSISTENT WITH GOVERNMENT GUIDANCE SET OUT UNDER THE RENEWABLE ELECTRICITY SUPPORT SCHEME. THE RED LINE BOUNDARY AND ALL OTHER ASPECTS OF THE PERMITTED DEVELOPMENT WILL REMAIN UNCHANGED
As published by the register.
Site area
99 m² from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Around this site this application first, then everything within 500 m

Explore from here
Click a dot to open its row.
Loading planning applications…
Free · during launch · limited time

Full planning report for 54.18615, -9.59141

Zoning, appeals, sold prices, flood and heritage — the whole area in one PDF.

No account, no payment. Not a statutory planning search.

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    No other designation nearby.

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 431067). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/MayoCC/AppFileRefDetails/19457/0.

    Source: npad · fetched 18 Sept 2026, 15:44
    SourceLicenceFetchedLink
    npadCC-BY-4.018 Sept 2026, 15:44open