Mayo County Council · 2560928

Existing Castlebar - Dalton 110kV overhead power line, See Particulars for multiple townlands, Co Mayo

Approved in Mar 2026. No sign of building yet.

Start notices are matched from the national building control register; a start on site can be missed.

What’s proposed

EirGrid PLC, with the consent and approval of the Electricity Supply Board (ESB), intends to apply for permission for works to uprate the existing Castlebar - Dalton 110 kV overhead line (OHL).

Show all

The proposed development will take place within the following townlands: Liscromwell Carrowkeel Brees Breandrum or Windsor Prison South Facefield Aghalusky Drumnaslooeen Mossbrook Cloontybaunan Ballinagran Ballynastangford Lower Derrynamraher Rathredmond Birchfield Cappavicar South Dooros Garrywadreen Keelkill Drumadoon Drumneen Ballinvoash Legaun Ballynastangford Upper Gneeve Ballymacloughlin Drumneen (Prendergast) Lisnaran Ballyrourke Ballynew Drumcorrabaun Pollavaddy Eskerlevally Kilmacrade Moat Drumneen South Burris Garhawnagh Castlegar Barrackland Carrowgarve Crantahar Rinnahulty Knocknamoghalaun Drumkeen Carrowmore Rathduff Clare Derreen Heathlawn Kilbeg-Malone Prison North Coolaghbaun The Castlebar - Dalton 110 kV circuit is 27.8 km in length and runs between the existing Castlebar 110 kV substation in the townland of Aghalusky in central County Mayo, to Dalton 110 kV substation located in the townland of Clare, eastern County Mayo. The OHL has a total of 144no. supporting structures. The proposed development will comprise: ? the replacement (“restringing”) of the existing OHL circuit conductor wires with a new higher capacity conductor between Castlebar 110 kV and the Dalton 110 kV substations; ? the replacement of end mast in-situ at 1no. location, with a similar structure; ? the replacement of angle masts in-situ at 6no. locations, with similar structures; ? the strengthening of tower foundations at 4no. locations; ? the strengthening of towers (i.e., member replacement) at 10no. locations; ? the painting of towers at 10no. locations; ? the replacement of tower bolts at 3no. locations; ? the replacement of polesets at 48no. locations, with similar structures. The change in structures will result in standardised heights from 16 m to 24 m along the circuit. The majority of the height increases will be between 0.1 m and 2.0 m; ? the replacement of insulating and ancillary hardware at all structure locations; ? the replacement of earthwire between structure number 132 and structure number 144; ? the replacement of stay wire / anchors and associated fittings at 16no. locations; ? the replacement of crossarms at 58no. locations; ? all associated temporary site development works to gain access to the existing structures…

Cut short by the council feed. Full text ↗

  1. 15 Dec 2025Received
  2. 12 Feb 2026Conditional
  3. 16 Mar 2026Final approval
  4. 15 Mar 2031Approval runs out

An email when the builder tells the council work is starting.

Planning details

Status
Approved
Decision
Conditional · 12 Feb 2026
Reference
2560928
Received
15 Dec 2025
Site
141.19 ha

2 other applications within 500 m in five years

Get the full report

Nearby 2 · 500 m · 5 years

Distance
Time

Explore this area on the map →

Homes nearby

Zoning

C2.1 — Economic development and employment

Zoned for employment uses. Housing is not the intended use here.

P1 — Rural

Zoned to protect agriculture, rural enterprise and biodiversity. New houses are restricted to demonstrated local need.

Protections nearby 250 m

  • NIAH-recorded building · 1
    house
  • Recorded monument · 56
    Enclosure; Mound
Where this comes from

National planning feed (NPAD), fetched 11 Nov 2026, 23:00.

Source: National Planning Application Database · fetched 11 Nov 2026, 23:00
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Nov 2026, 23:00open
Summary

2560928 is a planning application to Mayo County Council for eirGrid PLC, with the consent and approval of the Electricity Supply Board (ESB), received on 15 Dec 2025; permission was granted with conditions on 12 Feb 2026.