Townlands of Reask and Loughlinstown , Kilbrew , Co Meath
- 2 Nov 2021Received
- 7 Dec 2021Observations closed
- Status
- Withdrawn or invalid
- Decision
- Not yet
- Council
- Meath County Council
- Type
- PERMISSION
- Site
- 44.06 ha
What’s proposed
an extension to the solar PV farm granted permission under Register Reference AA/170860, ABP 301049-18 comprising the construction of approximately 78,870 no. photovoltaic panels on ground mounted frames on lands to the south and west of the permitted solar PV farm with a total combined site area of 42.88 hectares and associated ancillary development including 10 no. transformer stations, approximately 136 no. string-inverters, 3 no. CCTV security cameras each mounted on a 4 metre high pole, perimeter security fencing (2 metres high), the construction of vehicular bridge over the Kilbrew stream and the construction of hardcore access tracks between the photovoltaic panel arrays and to the permitted solar PV farm. A Natura Impact Statement has been prepared in respect of the proposed development
212109 is a planning application to Meath County Council for an extension to the solar PV farm granted permission under Register Reference AA/170860, received on 2 Nov 2021; the file is recorded as incompleted application.
Planning details
- Reference
- 212109
- Local authority
- Meath County Council
- Status
- Withdrawn or invalid · register status “INCOMPLETED APPLICATION”
- Received
- 2 Nov 2021
- Observations close
- 7 Dec 2021 (closed 1743 days ago)
- Decision due
- No due date published
- Decision
- Not decided
- Proposed development
- an extension to the solar PV farm granted permission under Register Reference AA/170860, ABP 301049-18 comprising the construction of approximately 78,870 no. photovoltaic panels on ground mounted frames on lands to the south and west of the permitted solar PV farm with a total combined site area of 42.88 hectares and associated ancillary development including 10 no. transformer stations, approximately 136 no. string-inverters, 3 no. CCTV security cameras each mounted on a 4 metre high pole, perimeter security fencing (2 metres high), the construction of vehicular bridge over the Kilbrew stream and the construction of hardcore access tracks between the photovoltaic panel arrays and to the permitted solar PV farm. A Natura Impact Statement has been prepared in respect of the proposed developmentAs published by the register.
- Site area
- 44.06 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Full planning report for 53.54151, -6.48291
Zoning, appeals, sold prices, flood and heritage constraints — everything for this area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
- Radon risk area · 1
- Recorded monument · 2
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 138729). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/MeathCC/AppFileRefDetails/212109/0.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |