Crossakiel , Kells , Co. Meath
Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness
212341 is a planning application for permission at Crossakiel , Kells , Co. Meath, received by Meath County Council on 15 Dec 2021 and first seen by Planning Register on 11 Sept 2026. The application describes: the development will consist of an expansion of the existing Facility, which includes; 1) construction of a single storey building, with an approximate gross floor area of 1.946 sqm, on land adjacent to the west of the existing Facility, where same building shall accommodate a reverberatory furnace, casting machine and associated production line, storage and loading areas and air abatement infrastructure. The reverberatory furnace will have a capacity of 25 tonnes per day, 2) construction of 22m high emission stack to be located adjacent to the existing 22m high emission stack, 3) provision of additional yard space and vehicle access ramp to/from the existing yard, 4) provision of stormwater attenuation unit and associated drainage and treatment infrastructure to cater for proposed building and proposed yard, 5) construction of additional staff welfare facilities building, 6) provision of staff and visitor car park comprising 52 no. spaces to serve P. Carney Limited to be located to the south-east of the Facility including associated stormwater drainage and treatment infrastructure, and including provision of private direct pedestrian access path to the Facility. Vehicular access to the car park will be via the existing Vartane Limited access onto the R154, Kilskeer road, 7) demolition of shed with an approximate gross floor area of 233 sqm, 8) provision of temporary access including sightline works, from the L1633, Collinstown Road, for the duration of construction works, to provide for construction traffic access/egress. This access will be removed following completion of the works, 9) construction of lined firewater retention pond, 10) landscaping works, 11) all ancillary site development works. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. This development requires an Industrial Emissions (IE) Licence, under the Environmental Protection Act 1992, as amended, which will be ought through a licence review application of the existing Integrated Pollution Control (IPC) Licence (Reg. no. P0402-02). The council granted permission on 16 Feb 2022, with conditions. The five-week observation window closed on 28 Jan 2022. Within 500 m there are 6 other decided applications in the last five years.
Proposal
the development will consist of an expansion of the existing Facility, which includes; 1) construction of a single storey building, with an approximate gross floor area of 1.946 sqm, on land adjacent to the west of the existing Facility, where same building shall accommodate a reverberatory furnace, casting machine and associated production line, storage and loading areas and air abatement infrastructure. The reverberatory furnace will have a capacity of 25 tonnes per day, 2) construction of 22m high emission stack to be located adjacent to the existing 22m high emission stack, 3) provision of additional yard space and vehicle access ramp to/from the existing yard, 4) provision of stormwater attenuation unit and associated drainage and treatment infrastructure to cater for proposed building and proposed yard, 5) construction of additional staff welfare facilities building, 6) provision of staff and visitor car park comprising 52 no. spaces to serve P. Carney Limited to be located to the south-east of the Facility including associated stormwater drainage and treatment infrastructure, and including provision of private direct pedestrian access path to the Facility. Vehicular access to the car park will be via the existing Vartane Limited access onto the R154, Kilskeer road, 7) demolition of shed with an approximate gross floor area of 233 sqm, 8) provision of temporary access including sightline works, from the L1633, Collinstown Road, for the duration of construction works, to provide for construction traffic access/egress. This access will be removed following completion of the works, 9) construction of lined firewater retention pond, 10) landscaping works, 11) all ancillary site development works. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. This development requires an Industrial Emissions (IE) Licence, under the Environmental Protection Act 1992, as amended, which will be ought through a licence review application of the existing Integrated Pollution Control (IPC) Licence (Reg. no. P0402-02)
- Status
- APPLICATION FINALISED
- Decision
- Conditional on 16 Feb 2022
- Final grant
- 1 Apr 2022
- Permission expires
- 31 Mar 2027
- Site (from polygon)
- 3.81 ha
- Location precision
- site (coords_polygon)
Timeline
- 15 Dec 2021New applicationObservation window closed 28 Jan 2022
- 16 Feb 2022DecisionAppeal window closed 16 Mar 2022

Full planning report for 53.71311, -7.02193
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 139034). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/MeathCC/AppFileRefDetails/212341/0.
Source: npad · fetched 11 Sept 2026, 18:51